Skip to main content

Thales deploys the first ETCS Level 2 system in Hungary

Thales and its consortium partner, the Hungarian company Dunántúli Kft., has signed a contract worth over US$91 million with the Hungarian infrastructure company NIF (National Infrastructure Development Company) to provide the state-of-art interlocking and electronic train protection technology for the 66 km Szajol-Püspöklandany line.
March 23, 2012 Read time: 1 min

596 Thales and its consortium partner, the Hungarian company 4237 Dunántúli Kft, has signed a contract worth over US$91 million with the Hungarian infrastructure company 4238 NIF (National Infrastructure Development Company) to provide the state-of-art interlocking and electronic train protection technology for the 66 km Szajol-Püspöklandany line.

Six years after having completed the first European cross-border ETCS project on the line between Vienna and Budapest, the latest project includes the design, delivery, installation and commissioning of Elektra electronic interlocking systems for five train stations, an operational management centre at Püspükladány station and an ETCS level 2 Radio Block Centre. Around 180 points and 340 signals are controlled by the operational management centre. The project is scheduled to be completed by the end of 2015.

Related Content

  • June 16, 2017
    Thales awarded two ticketing deals in Egypt
    Thales has signed two new fare collection contracts covering 19 new stations on the Cairo metro.
  • June 17, 2016
    Less travel aggravation to blunt Aggieland fans’ motivation
    Returning travel times to normal within two hours of the end of a major football game was the challenge facing College Station, Adam Lyons explains how this was achieved. College Station, TX, also known as ‘Aggieland’, is located right in the middle of the Dallas/Fort Worth, San Antonio and Houston triangle making the city accessible to over 14 million Texans within less than a four-hour drive. One of the biggest draws to this area is Texas A&M University (TAMU) and the Aggie football games in the fall, mea
  • January 20, 2015
    Kapsch awarded important GSM-R project in the Czech Republic
    Czech Republic railway infrastructure manager SŽDC has awarded Kapsch CarrierCom a further project worth around US$17 million to install state of the art GSM-R technology on the 185 kilometre third rail transit corridor in the country. The project is due to be completed by autumn 2016. Kapsch has already successfully implemented this technology in the Czech Republic on several sections of rail lines. The new line connects Prague with the West-Bohemian cities and ends at the German border. Kapsch will
  • December 16, 2014
    Do satellites provide a heavenly view of tolling’s future?
    Satellite-based tolling opens up new options for authorities and can be integrated with DSRC systems as David Crawford discovers. As the proud custodian of the European Union (EU)’s longest road network covered by a single (truck) charging scheme – and the only one to include all major roads - Slovakia has become the continent’s poster-nation for the virtues of GNSS/CN (Global Navigation Satellite System/Cellular Network)-based tolling. It is also proved to be a very fast implementer. Speaking at the 2014 I