Skip to main content

Thales to deploy ETCS Level 2 on Turkey's first high-speed rail line

Thales has signed a new US$26.3 million signalling contract with Turkish State Railways (TCDD) to install the ETCS Level 2 system, including automatic train protection and GSM-R communications, for the 250 km double-track Eskisehir-Sincan section of the Ankara-Istanbul high-speed line.
March 14, 2012 Read time: 1 min
596 Thales has signed a new US$26.3 million signalling contract with 3895 Turkish State Railways (TCDD) to install the ETCS Level 2 system, including automatic train protection and GSM-R communications, for the 250 km double-track Eskisehir-Sincan section of the Ankara-Istanbul high-speed line. This new equipment will increase the capacity of Turkey's first high-speed line, which is designed for speeds of up to 250 km/h (155mph) and was brought into commercial service by Thales in March 2009.

Thales is already closely involved in the project to upgrade the Ankara-Istanbul line and has been awarded ETCS Level 1 contracts for more than 400 km of double-track sections. The company delivered signalling and telecommunications solutions for the 256 km Hasanbey-Esenkent section in Phase 1 of the project, and is currently deploying signalling systems for a total of 180 km of other sections of the line.

For more information on companies in this article

Related Content

  • German authorities use CB-radio message to reduce accidents in roadworks
    April 8, 2014
    Citizen Band radio is proving useful to prevent accidents in Germany’s roadworks. In common with other German Länder (federal regions) with large volumes of commercial vehicles using their trunk road networks, Bavaria had been experiencing high levels of road traffic accidents (RTAs) involving heavy trucks in the vicinity of minor motorway maintenance sites. This was despite the extensive visual warning regulations published in the German federal road safety audit (RSA) guidelines for the protection of site
  • Rail industry, regulators debate feasibility of PTC
    March 10, 2014
    US rail industry officials and federal accident regulators have disagreed about the viability of a looming mandate that most US railways be equipped with automated control systems by the end of next year. Congress is requiring that most major railroad companies install automated systems known as positive train control (PTC) by December 2015. Automated train systems have gained renewed attention after a spate of high-profile accidents on passenger and freight railways, including most recently a Decem
  • Priority for safety and interoperability, need for DSRC
    July 18, 2012
    Justin McNew, Chief Technology Officer, Kapsch TrafficCom Inc., USA offers his opinion of where 5.9GHz DSRC technology will head in the coming years. The debate ranges back and forth over the most suitable technological solution for future tolling and charging in the US. However, the coming trend is common cooperative infrastructure: instrumented roads and vehicles with the capacity to communicate with each other over all manner of safety, mobility and traveller applications, many of which will involve fina
  • Jaipur Metro to get Thales supply passenger information system
    April 23, 2013
    Thales is to supply the Delhi Metro Rail Corporation (DMRC) with an advanced passenger information system for the new Jaipur Metro rapid transit system in India. Currently under construction, the metro will be one of the largest metro rail systems in India, with eight elevated and three underground stations. It is due to be commissioned in 2013. The Thales passenger information system will be interfaced with the traffic management system and will use a single software platform to enable the Jaipur Metro to