Skip to main content

Thales to deploy ETCS Level 2 on Turkey's first high-speed rail line

Thales has signed a new US$26.3 million signalling contract with Turkish State Railways (TCDD) to install the ETCS Level 2 system, including automatic train protection and GSM-R communications, for the 250 km double-track Eskisehir-Sincan section of the Ankara-Istanbul high-speed line.
March 14, 2012 Read time: 1 min
596 Thales has signed a new US$26.3 million signalling contract with 3895 Turkish State Railways (TCDD) to install the ETCS Level 2 system, including automatic train protection and GSM-R communications, for the 250 km double-track Eskisehir-Sincan section of the Ankara-Istanbul high-speed line. This new equipment will increase the capacity of Turkey's first high-speed line, which is designed for speeds of up to 250 km/h (155mph) and was brought into commercial service by Thales in March 2009.

Thales is already closely involved in the project to upgrade the Ankara-Istanbul line and has been awarded ETCS Level 1 contracts for more than 400 km of double-track sections. The company delivered signalling and telecommunications solutions for the 256 km Hasanbey-Esenkent section in Phase 1 of the project, and is currently deploying signalling systems for a total of 180 km of other sections of the line.

For more information on companies in this article

Related Content

  • ETC Corporation awarded $88 million tolling contract
    March 23, 2012
    The Port Authority of New York and New Jersey has awarded a contract, valued at approximately $88 million, to Electronic Transaction Consultants Corporation (ETC Corporation) to provide a facility-wide replacement toll collection and audit system as well as related system maintenance services. Under the contract, ETC will implement its latest generation Rite solution on the Port Authority’s toll facilities to deliver a number of advanced system features including a sophisticated toll data warehouse, an adva
  • Ascendi updates Portugal toll plazas
    July 1, 2022
    Nearly 200 lanes have been equipped with front and rear OCR Tattile Basic ANPR cameras
  • Kapsch to implement digital train radio system in Ireland
    March 14, 2012
    The Irish railway operator "Iarnród Éireann - Irish Rail" (IÉ) has awarded the implementation of a digital train radio system for the DART (Dublin Area Rapid Transit) region to Kapsch CarrierCom.
  • Turkmenistan railways modernise with Huawei GSM-R
    June 12, 2014
    Huawei is to supply its GSM-R solution for the Turkmenistan Buzhun-Serehtyaka and Bereket-Cilmammet integrated railway communications project. Huawei's customised solution features advanced communication technologies and equipment for the railway industry, including the DBS3800 distributed base stations and remote radio units (RRUs) which are installed at the top of towers, efficiently reducing the impact of antenna feeder loss on radio network coverage while satisfying the special local requirement that