Skip to main content

Thales delivers automated train control systems to Santiago de Chile

Thales has supplied its driverless train control system: Seltrac CBTC solution for Santiago de Chile’s new metro lines 3 and 6. The technology aims to ensure safety and efficiency across the entire route, with a 90 second interval between trains as well as lower long-term operating costs and savings in traction power. Launched on 2 November 2017, the new metro line 6 aims to carry over 20,000 passengers per hour in each direction. Together, both lines will have a combined length of 37km, with 28 station
November 8, 2017 Read time: 1 min

596 Thales has supplied its driverless train control system: Seltrac CBTC solution for Santiago de Chile’s new metro lines 3 and 6. The technology aims to ensure safety and efficiency across the entire route, with a 90 second interval between trains as well as lower long-term operating costs and savings in traction power.

Launched on 2 November 2017, the new metro line 6 aims to carry over 20,000 passengers per hour in each direction.

Together, both lines will have a combined length of 37km, with 28 stations and 37 trains.

The signaling system is a component of the solutions delivered by a consortium that consists of Thales and Spanish rail maker Construcciones y Auxiliar de Ferrocarriles. 

For more information on companies in this article

Related Content

  • Chile renews IRD weigh station maintenance contract
    August 13, 2014
    PAT Traffic, International Road Dynamics’ wholly-owned subsidiary in Santiago, Chile has been awarded the renewal of a contract by Direccion Nacional de Vialidad, MOP Chile, for the maintenance and service of IRD-PAT automated truck weigh stations installed by IRD.
  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • Kapsch TrafficCom expands electronic toll collection in Chile
    May 6, 2015
    Kapsch TrafficCom is strengthening its market in Chile, with the award of two contracts in the country through a subsidiary for the delivery of new multi-lane-free-flow gantries and on-board units. The first contract is for three new toll gantries for the urban part of the Pan-American Highway passing through Santiago de Chile, which are planned to be operational during 2015. These form part of a framework agreement with the concessionaire Autopista Central and will comprise Kapsch’s state-of-the-art sin
  • Lorries hitting rail bridges peak in October causing hours of delays and cancellations, Network Rail
    October 26, 2017
    Hundreds of thousands of rail passengers will suffer hours of delays and cancellations this month as figures for oversized lorries hitting low bridges (bridge-strikes) peaked in October/ November to around ten reported incidents every day, according to a new campaign by Network Rail. In addition, there are 2,000 bridge strikes every year costing the taxpayer some £23 million ($30 million) in damages and delays.