Skip to main content

Thales delivers automated train control systems to Santiago de Chile

Thales has supplied its driverless train control system: Seltrac CBTC solution for Santiago de Chile’s new metro lines 3 and 6. The technology aims to ensure safety and efficiency across the entire route, with a 90 second interval between trains as well as lower long-term operating costs and savings in traction power. Launched on 2 November 2017, the new metro line 6 aims to carry over 20,000 passengers per hour in each direction. Together, both lines will have a combined length of 37km, with 28 station
November 8, 2017 Read time: 1 min

596 Thales has supplied its driverless train control system: Seltrac CBTC solution for Santiago de Chile’s new metro lines 3 and 6. The technology aims to ensure safety and efficiency across the entire route, with a 90 second interval between trains as well as lower long-term operating costs and savings in traction power.

Launched on 2 November 2017, the new metro line 6 aims to carry over 20,000 passengers per hour in each direction.

Together, both lines will have a combined length of 37km, with 28 stations and 37 trains.

The signaling system is a component of the solutions delivered by a consortium that consists of Thales and Spanish rail maker Construcciones y Auxiliar de Ferrocarriles. 

For more information on companies in this article

Related Content

  • Santiago metro contract awarded
    January 20, 2014
    Spain’s Isolux Corsán has been awarded a US$100 million contract for the construction of a section of line 3 of the Santiago Metro in Chile. The project, part of the Metro Project, aims to improve the entire underground network in Santiago includes the construction of a 3.7 kilometre tunnel under the Chilean capital and includes the construction of three stations, five circular shafts and two rectangular shafts over a period of 28 months. It is expected to start operating in 2018.
  • Chile finally launches Santiago's airport tender
    June 24, 2014
    Chile's public works ministry MOP has launched a long-delayed tender to expand and operate Santiago's international airport, the first big project to be awarded under President Michelle Bachelet's administration. The US$655 million project entails the construction of a 200,000 sq m terminal with two wings exclusively for international flights and two additional wings that will alternate between international and domestic flights. The tender was initially expected to be launched last year, under former
  • B&C Transit modernises Miami-Dade Metrorail’s control systems
    June 1, 2016
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.
  • Chile launches ambitious transport plan
    November 7, 2014
    In an effort to boost a weakening economy, Chilean President Michelle Bachelet has announced a nearly US$4.2 billion transport infrastructure plan, including one new metro line in Santiago, cable car systems in three other cities and rail projects. The plan includes US$1.9 billion in new concessions, with the expansion of public-private partnerships (PPPs) to the metro system and US$2.2 billion in works directly funded by the government. In Santiago, the program involves developing feasibility studie