Skip to main content

Thales delivers automated train control systems to Santiago de Chile

Thales has supplied its driverless train control system: Seltrac CBTC solution for Santiago de Chile’s new metro lines 3 and 6. The technology aims to ensure safety and efficiency across the entire route, with a 90 second interval between trains as well as lower long-term operating costs and savings in traction power. Launched on 2 November 2017, the new metro line 6 aims to carry over 20,000 passengers per hour in each direction. Together, both lines will have a combined length of 37km, with 28 station
November 8, 2017 Read time: 1 min

596 Thales has supplied its driverless train control system: Seltrac CBTC solution for Santiago de Chile’s new metro lines 3 and 6. The technology aims to ensure safety and efficiency across the entire route, with a 90 second interval between trains as well as lower long-term operating costs and savings in traction power.

Launched on 2 November 2017, the new metro line 6 aims to carry over 20,000 passengers per hour in each direction.

Together, both lines will have a combined length of 37km, with 28 stations and 37 trains.

The signaling system is a component of the solutions delivered by a consortium that consists of Thales and Spanish rail maker Construcciones y Auxiliar de Ferrocarriles. 

For more information on companies in this article

Related Content

  • Vehicle tracking in New Hampshire saves time, improves efficiency
    February 2, 2012
    Provider Enterprises is the largest transportation company dedicated to special needs children in New Hampshire, US serving more than 1,500 children daily. Several years ago, the company decided to deploy GPS-based fleet tracking technology primarily to monitor the location of its 178-vehicle fleet for routing and quality-control purposes.
  • Fluor and partners to build and operate LAX Automated People Mover
    March 25, 2019
    Fluor and its partners are to construct and operate the Los Angeles International Airport’s (LAX) Automated People Mover, a project valued $4.9 billion, over the next 30 years. The announcement follows the completion of a pre-construction phase carried out by Fluor and its LAX Integrated Express Solutions (LINXS) team on behalf of Los Angeles World Airports. The line is expected to offer a rider capacity of up to 10,000 passengers per hour once it is operational in 2023. Terence Easton, president
  • Network Rail launches digital strategy to improve travel experience
    May 14, 2018
    Network Rail will carry out a digital railway strategy to help ensure that all new UK trains and signalling are digital or digital ready from 2019. The upgrade is aimed at improving the speed, punctuality and safety of the service. New digital rail technology will be utilised with the intention of allowing trains to run closer together and provide more frequent services. In addition, passengers are expected to be provided with improved mobile and WiFi connectivity. Train drivers will receive real-time
  • PTV simulates York’s future
    August 26, 2021
    PTV’s predictive software modelling is helping one of England’s historic cities to improve traffic flow