Skip to main content

Thales delivers ATO system for the Mecca metro

Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.
April 17, 2012 Read time: 2 mins
RSS596 Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.

The ATO (automatic train operation) solution is the last successful stage in this ambitious project, improving metro performance by allowing ‘hands off’ operation by drivers. The solution ensures that trains comply with required track speeds and operating conditions to ensure efficient, safe travel at all times.

Thales has provided a complete solution for the Mecca metro project, including signalling solutions based on its world-leading SelTrac Communications-Based Train Control (CBTC) system, fully integrated communications, an Operation Control Centre (OCC) to supervise the line and an automated passenger information system.

“After managing the security supervision of the holy sites, Thales is very proud to have contributed once again to the improvement of the pilgrimage with this automatic metro,” said Michelangelo Neri, VP for Thales’s civil business in Riyadh, Saudi Arabia.

For more information on companies in this article

Related Content

  • Thales releases 'autonomous-ready' CBTC  
    April 22, 2021
    SelTrac G8 has new digital architecture to minimise amount of trackside equipment 
  • Major rail contracts for Thales
    September 18, 2012
    Thales has announced the award of two major rail system contracts in Slovenia and China. The first, a US€40 million contract with the Slovenian Transport Ministry is for the provision of a complete European Train Control System (ETCS) Level 1 on the Slovenian part of Corridor D. Due for completion in 2015, this project in partnership with GH Holding concerns the 350 km line stretching from the Hungarian border to Italy. The company says this contract represents one of the most important ETCS Level 1 infras
  • Thales awarded Rapid Metro Gurgaon contract
    December 22, 2014
    Thales has won the contract to provide Automatic Fare Collection (AFC) systems for Phase II of Rapid Metro Gurgaon (operated by IL&FS Rail Limited – IRL), which connects to the Delhi metro. Under the Phase II project, Thales will provide, install, test and commission complete AFC systems for the new five-station section of the metro system between Sikandarpur and Sector 55-56. The project is expected to be completed in 24 months.
  • Thales wins major ETCS Level 2 project in Hungary
    May 28, 2012
    Thales Austria has signed the contract with the Hungarian infrastructure company NIF to provide modern electronic train control technology for the 101 km electrified Boba-Bajánsenye line. The contract includes the design, supply, installation and commissioning of a complete European Train Control System (ETCS) Level 2 solution and adaptations to the existing ETCS Level 1 system.