Skip to main content

Thales delivers ATO system for the Mecca metro

Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.
April 17, 2012 Read time: 2 mins
RSS596 Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.

The ATO (automatic train operation) solution is the last successful stage in this ambitious project, improving metro performance by allowing ‘hands off’ operation by drivers. The solution ensures that trains comply with required track speeds and operating conditions to ensure efficient, safe travel at all times.

Thales has provided a complete solution for the Mecca metro project, including signalling solutions based on its world-leading SelTrac Communications-Based Train Control (CBTC) system, fully integrated communications, an Operation Control Centre (OCC) to supervise the line and an automated passenger information system.

“After managing the security supervision of the holy sites, Thales is very proud to have contributed once again to the improvement of the pilgrimage with this automatic metro,” said Michelangelo Neri, VP for Thales’s civil business in Riyadh, Saudi Arabia.

For more information on companies in this article

Related Content

  • TST awarded signalling contract for shanghai automated metro line
    January 30, 2018
    Shanghai Shentong Metro Group has awarded Thales SEC Transport the signalling contract for the Fully Automated Operation (FAO) Line 14 of the City’s Metro. It will provide an integrated management system as well as signalling and supervision solutions with the intention of meeting the demand for metro transport capacity and alleviating traffic in the downtown area. The driverless and highly automated line is scheduled to enter service at the end of 2020.
  • TagMaster wins order from Bombardier for São Paulo Line 5 Project
    July 25, 2012
    Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.
  • Network Rail successfully tests new trains using advanced ‘in-cab’ signalling system
    August 5, 2016
    An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time. The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘cor
  • Running on empty
    May 2, 2018
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate