Skip to main content

Thales delivers ATO system for the Mecca metro

Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.
April 17, 2012 Read time: 2 mins
RSS596 Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.

The ATO (automatic train operation) solution is the last successful stage in this ambitious project, improving metro performance by allowing ‘hands off’ operation by drivers. The solution ensures that trains comply with required track speeds and operating conditions to ensure efficient, safe travel at all times.

Thales has provided a complete solution for the Mecca metro project, including signalling solutions based on its world-leading SelTrac Communications-Based Train Control (CBTC) system, fully integrated communications, an Operation Control Centre (OCC) to supervise the line and an automated passenger information system.

“After managing the security supervision of the holy sites, Thales is very proud to have contributed once again to the improvement of the pilgrimage with this automatic metro,” said Michelangelo Neri, VP for Thales’s civil business in Riyadh, Saudi Arabia.

For more information on companies in this article

Related Content

  • Derq signs Saudi Arabia MoU
    February 9, 2022
    Agreement is part of plan to eventually make Holy City of Makkah (Mecca) into a smart city
  • Thales scoops Hong Kong signalling contract
    September 5, 2013
    Thales has been awarded a contract by Hong Kong’s metro operator, MTR Corporation, to provide signalling technology for Shatin to Central Link Phase 1 segment of the Hong Kong metro using a communications-based train control (CBTC) system. To provide fully automatic train operation the contract includes the modernisation of the Ma On Shan Line and West Rail Line lines, where Thales previously installed its CBTC solution in 2003/04.
  • San Francisco opts for Thales train control
    October 21, 2014
    Thales has been awarded a US$24.7 million contract by the San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, a 1.7 mile extension of the existing T Line. The company will supply its field-proven SelTrac communications based train control (CBTC) technology for the project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide
  • Thales wins San Francisco train control contract
    October 15, 2014
    Thales has been awarded a US$23 million contract by the San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, an extension of the existing T Line. Thales will supply its field-proven SelTrac communications based train control (CBTC) technology for the 1.7 mile project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide a ra