Skip to main content

Thales to deliver signalling system for southern Gotthard extension

Following completion of the Gotthard tunnel, AlpTransit Gotthard has awarded Thales a US$64 million (€57 million) signalling contract for the new Ceneri tunnel, the final section of the transalpine rail corridor that will link Zurich and Milan in less than three hours journey time. Located 25 km south of the Gotthard tunnel, the Ceneri Base Tunnel between Bellinzona and Lugano in Switzerland is 15.4 km long and, like the Gotthard tunnel, comprises two single-track tubes separated by a space of 40 metres
September 19, 2016 Read time: 2 mins
Following completion of the Gotthard tunnel, AlpTransit Gotthard has awarded 596 Thales a US$64 million (€57 million) signalling contract for the new Ceneri tunnel, the final section of the transalpine rail corridor that will link Zurich and Milan in less than three hours journey time.

Located 25 km south of the Gotthard tunnel, the Ceneri Base Tunnel between Bellinzona and Lugano in Switzerland is 15.4 km long and, like the Gotthard tunnel, comprises two single-track tubes separated by a space of 40 metres.

Thales will provide its latest ETCS Level 2 train control technology and will have overall responsibility for project management and integration of train command and control systems. The tunnel is scheduled to open in 2020.

Thales’ signalling technology is expected to reduce the journey time between Locarno and Lugano from today's 55 minutes to 22 minutes, with more than 300 trains travelling in both directions every day at speeds of up to 250 km/h.

For more information on companies in this article

Related Content

  • Flexible, demand-based parking charges ease parking problems
    April 10, 2012
    Innovative parking initiatives on the US Pacific Coast. David Crawford reviews. Californian cities are leading the way in trialling new solutions to their endemic parking problems. According to Donald Shoup, a professor of urban planning at the University of California in Los Angeles, drivers looking for available spots can cause up to 74% of traffic congestion in downtown areas. One solution is variable, demand-responsive pricing of parking.
  • Alstom wins new Kochi metro line contracts
    January 23, 2015
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour
  • Luton to Dunstable guided busway opens
    September 25, 2013
    Following many years of planning, the Luton and Dunstable guided busway is now open to the public. The US$146 million project will provide a reliable and efficient 15 minute public transport link between the two main town centres. Overall, the route involves over 10 kilometres of segregated bus-only road from Luton Airport through Dunstable to Houghton Regis in Bedfordshire.
  • High speed rail signalling system contract win for Hollysys
    January 9, 2013
    In a contract valued at around US$10.75 million, Chinese provider of automation and control technologies, Hollysys Automation Technologies, is to supply the ground-based signalling system for the 357 km Guangdong section of the Xiamen-Shenzhen high-speed rail line which has a designed travelling speed of 200 km/h. Hollysys will provide the ground-based high-speed rail signaling system, including train control centres (TCC), line-side electronic units (LEU) and other auxiliary equipments, which are expected