Skip to main content

Thales chosen to lead contract on security system implementation in 61 RFI stations

Thales has been chosen by Italian rail network operator Rete Ferroviaria Italiana (RFI) to lead a pool of companies on implementing security systems on 61 RFI stations across various regions in Italy. The project aims to help security personnel respond more proactively to enhance passenger safety and is part of a long-term strategic plan to modernize the entire rail network. Other partners involved in the project include Leonardo, Ingegneria & Software Indistriale and SE.GI. The contract includes Closed
November 28, 2017 Read time: 2 mins
596 Thales has been chosen by Italian rail network operator Rete Ferroviaria Italiana (RFI) to lead a pool of companies on implementing security systems on 61 RFI stations across various regions in Italy. The project aims to help security personnel respond more proactively to enhance passenger safety and is part of a long-term strategic plan to modernize the entire rail network.  

Other partners involved in the project include Leonardo, Ingegneria & Software Indistriale and SE.GI.

The contract includes Closed Circuit TV, access control/intrusion detection, smoke detection, protection fences, power efficiency, lighting, data transmission and wiring. The systems are intended to enable operators to respond to acts of vandalism as well as violent and aggressive behaviour.

New systems are designed with the intention of integrating with legacy systems to ensure operational continuity within the scope of a five-year warranty and maintenance services. The proposed solution includes introducing new centralised software platforms to broaden the spectrum of activities that can be monitored at reduced maintenance costs.

For more information on companies in this article

Related Content

  • Opening the closed-loop to realise ITS benefits
    April 8, 2014
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag
  • Improving, integrating weather monitoring for safer roads
    February 6, 2012
    Paul Pisano, USDOT Federal Highway Administration, and Charles Harris, Noblis Inc, chart progress in the US of Maintenance Decision Support Systems for winter maintenance and weather management
  • Thales awarded first metro signalling contract in Brazil
    March 27, 2012
    Thales has been selected by Andrade Gutierrez (AG) and CR Almeida to deliver its SelTrac communications-based train control (CBTC) signalling solution for Line 17 of the São Paulo metro. The new line will be driverless and fully automatic. The first phase of implementation is planned to support the 2014 FIFA World Cup, with completion scheduled for August 2014, a record delivery time of just 27 months. The new 18km elevated line will be built by a consortium led by Andrade Gutierrez (AG) and including CR Al
  • Wi-Fi win-win for mass transit
    October 31, 2014
    David Crawford explores passenger and operator benefits of on-board Wi-Fi Urban commuters’ growing demand for continuous – and reliable - internet connectivity is spurring network operators into the rapid installation of high-grade Wi-Fi access on their surface and underground networks, as well as in their stations. Such moves are often a key part of strategies to maintain and increase ridership levels.