Skip to main content

Thales brings metro expertise to Australia

Thales has been selected to provide the central control and communication systems for Sydney Metro Northwest, the first fully-automated metro rail system in Australia, which opens in the first half of 2019 with a train every four minutes in the peak. Thales will deliver both systems to the Northwest Rapid Transit consortium (NRT) as a key supplier to NRT’s systems joint venture. With an approximate value of US$5.5 billion, Sydney Metro Northwest is the first stage of Sydney Metro, which aims to deliver a
November 20, 2015 Read time: 2 mins
596 Thales has been selected to provide the central control and communication systems for Sydney Metro Northwest, the first fully-automated metro rail system in Australia, which opens in the first half of 2019 with a train every four minutes in the peak. Thales will deliver both systems to the Northwest Rapid Transit consortium (NRT) as a key supplier to NRT’s systems joint venture.

With an approximate value of US$5.5 billion, Sydney Metro Northwest is the first stage of Sydney Metro, which aims to deliver a new standalone 36 km metro rail system for Sydney, including eight new railway stations, upgrade of five existing stations and 4,000 commuter car parking spaces.

The New South Wales Government plans to extend the from the end of Sydney Metro Northwest, under Sydney Harbour, through new underground stations in the CBD and southwest to Bankstown.

The central control system will ensure seamless rail operations, including real-time control mechanisms and data for various diverse systems, while providing a holistic view of the entire network. The communication system will connect the public address, the passenger information systems, the CCTV and digital information boards, to a centralised system allowing a fully integrated approach to information management.

For more information on companies in this article

Related Content

  • Thales awarded signalling contract for Brazil metro
    March 25, 2014
    Thales has been selected by metro operator CCR Metrô Bahia to provide a signalling solution for lines 1 and 2 of the new metro in Salvador, Brazil’s third largest city. Thales will deliver its world leading SelTrac communications-based train control (CBTC) signalling solution, providing fully automatic driverless operation. Lines 1 and 2 cover a combined distance of 31 kilometres and serve 19 stations. The new metro will be part of an integrated transportation system, serving Luiz Eduardo Magalhães
  • Thales awarded signalling contract for Brazil metro
    March 25, 2014
    Thales has been selected by metro operator CCR Metrô Bahia to provide a signalling solution for lines 1 and 2 of the new metro in Salvador, Brazil’s third largest city. Thales will deliver its world leading SelTrac communications-based train control (CBTC) signalling solution, providing fully automatic driverless operation. Lines 1 and 2 cover a combined distance of 31 kilometres and serve 19 stations. The new metro will be part of an integrated transportation system, serving Luiz Eduardo Magalhães
  • Thales to supply ticketing system for India’s Gurgaon Metro
    March 26, 2012
    Thales has been awarded a contract to implement a ticketing system for the Rapid MetroRail Gurgaon, a new metro transit system in the city of Gurgaon, connected to Delhi metro.
  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab