Skip to main content

Thales awarded two ticketing deals in Egypt

Thales has signed two new fare collection contracts covering 19 new stations on the Cairo metro.
June 16, 2017 Read time: 1 min

596 Thales has signed two new fare collection contracts covering 19 new stations on the Cairo metro. Both contracts are part of the Line 3 extension project: Phase 3 is the western branch of the line and includes 15 new stations, and Phase 4B is the eastern side of the line, with four stations. The two new contracts follow earlier awards in December 2015 to upgrade the fare collection systems on Lines 1 and 2 of the Cairo metro.

Thales will deploy its latest TransCity systems into the existing infrastructure: 70 automatic vending machines, 177 ticket office machines, 50 portable ticket control terminals as well as 460 new-generation automated access gates, which will speed throughput and provide smoother passenger flows.

Related Content

  • August 23, 2017
    Thales to deliver AFC system for Bangkok’s Blue Line
    Thales has been selected by the Bangkok Expressway Metro Public Company (BEM) and CH. Karnchang (CK) to deliver the automatic fare collection (AFC) system for the Bangkok metro's Blue Line Extension, utilising its TransCity ticketing solution. The Chaloem Ratchamongkhon MRT line, better known as the Blue Line, was the first of Bangkok's underground metro lines to open in 2004. Thales is the current supplier of the automatic fare collection system for the existing Blue Line, which now comprises 18 station
  • June 1, 2022
    Indra gets on board Cairo monorail
    Group will provide ticketing technology and access control for Egypt's new transit system
  • March 22, 2016
    Thales to upgrade Taipei’s metro ticketing
    As part of Taiwan’s Ministry of Transport and Communications’ initiative to respond to the need for wider interoperability, the Taipei Rapid Transit Corporation, which operates the concession for the metro network in Taipei, has opted for Thales’s fare collection solution, to be rolled out progressively throughout 2016. The upgrade covers the entire metro network, including more than 1,500 fare gates across 120 stations, with a daily flow of over 1.97 million passengers. The Thales solution includes the
  • July 6, 2022
    Thales joins Cairo metro pyramid scheme
    Company will provide communications and ticketing for line connecting Giza with Cairo