Skip to main content

Thales awarded Manaus monorail CBTC signalling contract

The Manaus metro in the city of Amazonas in the heart of the Amazon is to be equipped with Thales’ automated driverless monorail solution, following the award to the company of its second signalling Communications-Based Train Control (CBTC) project in Brazil in less than a year for the The signalling contract was awarded to Thales by the Monotrilho Manaus Consortium, comprising CR Almeida, Mendes Junior, and Serveng-Civilsan e Scomi. The 20 km monorail will be a fully automated driverless system using Thale
November 13, 2012 Read time: 2 mins
The Manaus metro in the city of Amazonas in the heart of the Amazon is to be equipped with 596 Thales’ automated driverless monorail solution, following the award to the company of its second signalling Communications-Based Train Control (CBTC) project in Brazil in less than a year.

The signalling contract was awarded to Thales by the Monotrilho Manaus Consortium, comprising 4430 CR Almeida, 6871 Mendes Junior, and Serveng-Civilsan e Scomi.

The 20 km monorail will be a fully automated driverless system using Thales’ SelTrac CBTC. Implementation will be carried out in two phases with partial completion planned for the FIFA World Cup in 2014.

“After Sao Paulo line 17, this is Thales’ second CBTC project in Brazil and we are delighted to experience this success in such a short time,” said Julien Rousselet, Thales Brazil country director. “Brazil is determined to use the best technology in the world to improve the mobility of its citizens and we are pleased that our SelTrac CBTC driverless system has again been selected.”

The SelTrac CBTC system will be supplied by Thales’ Toronto-based subsidiary, which developed the technology 25 years ago, along with Thales’ Brazilian subsidiary Omnisys.

Thales say their CBTC technology has evolved over time, enabling operators to benefit from low operating and maintenance costs, optimal life cycle costs and proven driverless technology while passengers get smoother travel. To date, Thales has applied CBTC signalling to 54 projects in 31 cities worldwide, moving three billion passengers per year.

Related Content

  • August 17, 2015
    Thales Siemens JV wins Spanish high speed rail contract
    Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
  • June 5, 2018
    Russia 2018 World Cup: ITS can win it
    Teams and supporters will cover vast distances in Russia for the 2018 FIFA World Cup. Stephane Clauss from Sony Europe’s Image Sensing Solutions division examines how the latest camera technologies can be deployed to help things run smoothly over the next month or so... For one month, from June 14, Russia is hosting the 2018 FIFA World Cup. This is the largest country in the world and the distances between venues will be larger than at almost any other World Cup - bar the finals in the US and Brazil.
  • November 20, 2013
    Arjowiggins Security showcases Brazilian connections
    Arjowiggins Security has strong links with CARTES 2013’s Guest of Honour Country, Brazil. The company has had a presence in Brazil since 1977, and employs almost 400 staff between a plant in Salto and a sales office in Sao Paulo.
  • January 2, 2018
    Bombardier's joint venture launches monorail project in China
    CRRC Puzhen Bombardier Transportation Systems Limited (PBTS), a joint venture between Bombardier Transportation and CRRC Corporation, has won a contract to deliver its Innovia Monorail 300 platform (IM300) along with 240 cars to Wuhu City in Anhui Province, to open in 2020. The deal, valued ¥1.785b (£203m), is designed with the intention of providing a reliable and green transportation system that better serves its passengers. This project will consist of a 30.3km line with 24 stations, while a second