Skip to main content

Test 7th January 2016 News 1

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
January 6, 2016 Read time: 2 mins
Sanral has become the subject of much political debate and protests on the streets of South Africa

593 Teledyne Dalsa Tolling technology is now at an advances state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports.
Intro ends

Some African countries grappling with infrastructure financing are fine-tuning their public private partnership policies to allow innovations such as road tolling in mobilising funds for modernisation and maintenance of their highways.

According to the African Development Bank, the continent has an estimated $46Bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93Bn annually to meet its infrastructure development needs - but only half of the financing is available.

A few countries have introduced intelligent transport systems on improved road sections and concessioning of selected stretches. This is being combined with better road maintenance and expenditure management, project pricing reforms, better and regulatory change to finance much needed rehabilitation and maintenance of roads as well as the construction and upgrading of roads and highways.

Tolling of roads is gaining traction (albeit slowly and with opposition from some road users) as national road agencies begin to address the need to increase road capacity and reduce chronic congestion in Africa’s cities.
South Africa lead the road tolls strategy with the launch of the Gauteng Freeway Improvement Project (GFIP) by the South African National Roads Agency (Sanral), a state-run firm mandated to manage, maintain and develop the country’s national road network.

GFIP entailed the upgrading of 200km (125 miles) of highway (later extended to 560km/350 miles) by widening existing freeways to four lanes and building new freeways and bridges as well as the rehabilitation of existing ones. Following the upgrading, free-flow electronic tolling was introduced in late 2013.

Two years before the e-tolls went live, Sanral awarded the contract for the multilane free flow tolling system to Electronic Toll Collection, a subsidiary of Kapsch TrafficCom.

Kapsch told ITS International the contract covered the design and implementation of an open road tolling system for the Gauteng Province, a national transaction clearing house and violations processing centre.

Related Content

  • May 13, 2024
    A Texas star for ViaPlus
    Firm will provide number-plate imaging in Houston for Harris County’s toll authority
  • November 28, 2013
    Taiwan to go all-electronic free flow tolling
    Taiwan’s 900 kilometres of toll roads will transition to all-electronic free flow operations early next year. The roads, which include three north-south routes with 22 toll points, carry out around 1.7 million transactions a day, generating some US$700 million of annual toll revenue. Private contractor Far Eastern Electronic Toll Collection Company (FETC), under contract to the National Freeway Bureau to collect the tolls, says that the IR-based toll system worked well and some 43 per cent of transactio
  • February 25, 2015
    San Francisco plans express lane network across Bay Area
    Colin Sowman looks at plans to convert 240km (150 miles) of HOV/car pool lanes. While some authorities have debated the conversion of high occupancy vehicle lanes (HOV) into express or managed lanes allowing toll paying single-occupant vehicles to avoid congestion, San Francisco’s Bay Area Metropolitan Transportation Commission (MTC) has acted. It is converting 240km (150 miles) of HOV/car pool lanes to express lanes and last fall the MTC’s Bay Area Infrastructure Financing Authority selected TransCore to d
  • November 13, 2014
    Colombian highway sees ITS tested to the extreme
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.