Skip to main content

Teleste’s on-board solution to be used in Merseytravel metro trains

Finnish technology company Teleste’s on-board solution will be utilised on rail group Stadler's Merseytravel Metro trains, due to be delivered to Liverpool by 2020. The device will be installed on 52 vehicles to help improve safety for passengers. Teleste’s system comprises Ethernet network, intercommunication and passenger counting, public address system, passenger information system and high-quality LED and side-by-side thin-film transistor LCD displays for information delivery and advertising.
May 22, 2018 Read time: 1 min
Finnish technology company Teleste’s on-board solution will be utilised on rail group Stadler's 8509 Merseytravel Metro trains, due to be delivered to Liverpool by 2020. The device will be installed on 52 vehicles to help improve safety for passengers.


Teleste’s system comprises Ethernet network, intercommunication and passenger counting, public address system, passenger information system and high-quality LED and side-by-side thin-film transistor LCD displays for information delivery and advertising.

Train drivers can now open and close doors and dispatch the train from a station while rear-view cameras and cabin monitors are fitted for safe passage on side access doors. The trains also feature a CCTV system inside to monitor passenger safety inside the carriages.

For more information on companies in this article

Related Content

  • Temporary CCTV poses more challenges than permanent installations
    June 12, 2015
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
  • LA Airport Metro Connector breaks ground
    July 5, 2021
    Project includes electric bus charging stations and is scheduled for 2024 completion
  • 2getthere’s Group Rapid Transit vehicle passes desert climate test
    October 26, 2017
    2getthere’s Group Rapid Tansit (GRT) autonomous vehicle has proven in a simulated desert climate that it can maintain an indoor temperature of 23˚C even in the worst scenario (52˚C outside temperature and 3% humidity). The climate test took place in the Utrecht province and is one of many tests regarding the mega-order received from United Arab Emirates earlier this year. From 2020, five vehicles will perform fully autonomous shuttle services to and from Bluewater Island in Dubai.
  • Optibus expands end-to-end platform with Control
    June 16, 2025
    Modular solution helps public transportation providers with live service delivery