Skip to main content

Tata to install 300 EV charging stations in India

Tata Power is working with Tata Motors to install 300 fast-charging electric vehicle (EV) stations across five cities in India by 2020. Praveer Sinha, CEO Tata Power, says: “We are committed to making India EV ready in line with the government’s ambition of providing green technology solutions and Tata group’s vision of reducing India’s carbon footprint.” The partners inaugurated the first seven charging stations in the city of Pune and will install 45 more in Mumbai, Delhi, Bangalore and Hyderabad. These
August 21, 2019 Read time: 1 min
Tata Power is working with Tata Motors to install 300 fast-charging electric vehicle (EV) stations across five cities in India by 2020.


Praveer Sinha, CEO Tata Power, says: “We are committed to making India EV ready in line with the government’s ambition of providing green technology solutions and Tata group’s vision of reducing India’s carbon footprint.”

The partners inaugurated the first seven charging stations in the city of Pune and will install 45 more in Mumbai, Delhi, Bangalore and Hyderabad. These chargers will be installed at Tata Motors dealerships, Tata retail outlets and other public locations.

The first 50 chargers will offer 15kW of power. Going forward, the partners will operate charging stations that range between 30-50kW.

Related Content

  • Motown morphs into Mobility City
    August 7, 2018
    Detroit was once a byword for urban decay – but ITS America recently held its annual meeting there. This gave David Arminas a chance to assess how fast Motor City is moving down the road to recovery. Motor City, as Detroit is still called, was on its financial knees only five short years ago. The future looked bleak as the city and greater urban area bled jobs and population. It was on 18 July 2013 that Motown, as Detroit is also known, filed for Chapter 9 bankruptcy protection, the
  • Cost benefit analysis ‘can’t be carried out with a cookbook’
    June 25, 2018
    There is far more to working out the worth of a project than simply filling in a few headings on a spreadsheet. David Crawford surveys some recent thinking from the US and Canada. Cost benefit analysis (CBA) “can’t be carried out with a cookbook”, warns US analyst Professor Robert J Brent. “ You can’t just get out a spreadsheet and fill in the data for all the headings. Each transport CBA should have something that is distinctive, in terms of location (for example, for a rural area), types of user
  • ABB deploys 30 fast-charging stations in Zurich
    June 14, 2018
    Swiss power and automation company Asea Brown Boveri (ABB) has deployed 30 fast-charging stations to Zurich to support the city’s transition to sustainable mobility. The Terra 54 stations will be implemented in central, publicly-accessible locations in the city and surrounding areas. ABB says the solution is suitable for charging electric cars, buses and trucks quickly to add range of 100-300km.
  • ABB deploys 30 fast-charging stations in Zurich
    August 8, 2018
    Swiss power and automation company Asea Brown Boveri (ABB) has deployed 30 fast-charging stations to Zurich to support the city’s transition to sustainable mobility. The Terra 54 stations will be implemented in central, publicly-accessible locations in the city and surrounding areas. ABB says the solution is suitable for charging electric cars, buses and trucks quickly to add range of 100-300km.