Skip to main content

Sweden gets train de-icing system

Dutch construction company Ballast Nedam is to supply Swedish public transport organisation Trafikförvaltningen Stockholm (TF) with a train de-icing system to improve winter train services in the country. The system is based on Ballast Nedam’s existing fully automated de-icing system which sprays the entire train with warm water system, redesigned to TF’s train specifications. The amount of water is adapted for each set of wheels depending on the degree of ice build-up. This ensures that the ice, which p
September 13, 2013 Read time: 2 mins
Dutch construction company 7483 Ballast Nedam is to supply Swedish public transport organisation Trafikförvaltningen Stockholm (TF) with a train de-icing system to improve winter train services in the country.

The system is based on Ballast Nedam’s existing fully automated de-icing system which sprays the entire train with warm water system, redesigned to TF’s train specifications. The amount of water is adapted for each set of wheels depending on the degree of ice build-up. This ensures that the ice, which primarily accumulates on the underside of the train and around the wheels, will melt away quickly and evenly.

Ballast Nedam will be responsible for the maintenance of the de-icing system for at least two years after delivery. The company’s Swedish partner, AWI Maskin, will carry out the installation, as well as service and maintenance work on location.

The project will be ready for delivery in December 2013.

For more information on companies in this article

Related Content

  • Ramp metering delivers - again
    January 27, 2012
    Though still controversial, ramp metering, which has been around for nearly 50 years, continues to deliver substantial benefits, and generally for relatively small cost. Kansas City is a case in point. In March 2010, Kansas City Scout, a partnership between the Missouri and Kansas Departments of Transportation to provide ITS for the greater Kansas City Area, activated the first ramp metering system in the region. The project is located on an 8.85km (5.5 mile) section of Interstate 435 from Metcalf Avenue to
  • Belarus toll system expanded
    August 7, 2014
    The BelToll electronic toll collection system, implemented and operated by Kapsch TrafficCom in Belarus, Serbia, was expanded by another 256 kilometres at the beginning of August, just one year after its commissioning in 2013. The system, which was also expanded by 815 kilometres in January 2014, is now 1,189 kilometres long; according to Kapsch TraffiCom, the number of registered vehicles has more than trebled since the system was put into operation, increasing from 60,000 to 190,000 vehicles.
  • Arriva wins Netherlands contract in Gelderland
    October 25, 2024
    Bus deal starts in December 2025 and could run until 2042 if extension applied
  • World’s first year-round winter test centre for vehicle and tyre manufacturers
    April 23, 2012
    Test World Oy is building a year-round winter test centre in Finland which will fulfil the needs and demands of vehicle and tyre manufacturers. The first phase of construction will start in next month and this part of the site will be in operation before the end of the year. The three-phase project, which will create a 30,000 m 2 test centre serving vehicle manufacturers and sub-contractors, will be completed by the end of 2015.