Skip to main content

Study identifies Canada’s worst traffic bottlenecks

Canada’s top 20 most congested traffic bottlenecks may cover just 65 kilometres, but they collectively cost drivers over 11.5 million hours and an extra 22 million litres of fuel per year. These are two findings of Grinding to a Halt, Evaluating Canada’s Worst Bottlenecks, released by the Canadian Automobile Association (CAA). Studies show that bottlenecks are the single biggest contributor to road delay, far outpacing traffic accidents, inclement weather and construction. The report provides data-based
January 12, 2017 Read time: 2 mins
Canada’s top 20 most congested traffic bottlenecks may cover just 65 kilometres, but they collectively cost drivers over 11.5 million hours and an extra 22 million litres of fuel per year. These are two findings of Grinding to a Halt, Evaluating Canada’s Worst Bottlenecks, released by the Canadian Automobile Association (CAA).


Studies show that bottlenecks are the single biggest contributor to road delay, far outpacing traffic accidents, inclement weather and construction. The report provides data-based evidence for decision-makers to use when making decisions on infrastructure investment and environment policy.  It includes the cost to Canadians of these bottlenecks in terms of lost time, productivity and added greenhouse gas emissions.

“Traffic congestion is a major source of stress for Canadians. Our study concludes that traffic bottlenecks affect Canadians in every major urban market, increasing commute times by as much as 50 per cent,” said Jeff Walker, vice-president of Public Affairs for CAA National. “Reducing these bottlenecks will increase the quality of life for millions of Canadians, save millions in fuel costs and reduce greenhouse gases, helping contribute to Canada’s climate change commitments.”

Toronto has ten bottlenecks in the top 20, Montreal five, Vancouver four and Quebec City one. Other cities such as Calgary, Edmonton, Regina, Winnipeg, Ottawa and Halifax also experience serious traffic delays.

Related Content

  • Cost benefit: Toronto retimings tame traffic trauma
    July 19, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s
  • Cost benefit: Toronto retimings tame traffic trauma
    July 11, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion. Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s to
  • Impark deploys hangtag at parking facilities, Canada
    December 11, 2017
    Imperial Parking Canada Corporation (Impark) has deployed its hangTag app at parking facilities which is said to allow parkers to locate facilities on a map, view lot details, get driving directions, and pay without going to the meter. It also provides an early notification when a session is about to expire, allowing users to extend time from their phone. Impark plans to expand the service through its operations in the U.S. and has over 860 locations across Canada. The app is currently available for use
  • Canada’s infrastructure sector set to be one of the best performing
    November 20, 2013
    In their latest findings on Canada’s infrastructure sector, Business Monitor has revised down their outlook for the overall construction industry in Canada for 2013 to 2.2 per cent. This is being driven by a sharper than expected contraction in industry value creation from the residential and non-residential building segment. Despite this, they anticipate a slight pick-up in the second half of the year will ensure that subsector maintains positive growth. On the other hand, infrastructure will post another