Skip to main content

Strabag wins Polish bypass contract

A consortium of Strabag and its subsidiary Heilit and Woerner has been awarded a US$51.7 million design-and-build contract for a 7.6 kilometre bypass around the city of Kościerzyna in northern Poland. The project comprises the construction of three traffic lanes with one additional lane that can be adapted for traffic if needed. It also includes nine civil engineering structures, including bridges and a railway overpass; environmental protection measures such as noise barriers and wildlife crossings; a
September 11, 2014 Read time: 1 min

A consortium of 3861 Strabag and its subsidiary Heilit and Woerner has been awarded a US$51.7 million design-and-build contract for a 7.6 kilometre bypass around the city of Kościerzyna in northern Poland.

The project comprises the construction of three traffic lanes with one additional lane that can be adapted for traffic if needed. It also includes nine civil engineering structures, including bridges and a railway overpass; environmental protection measures such as noise barriers and wildlife crossings; a rainwater drainage system; and the modernisation and construction of access roads. Approximately eight months are scheduled for the planning and 30 months for the construction phase.

For more information on companies in this article

Related Content

  • Israel awards northern line rail tender
    April 15, 2014
    Netivei Yisrael, the National Roads Company of Israel, has awarded the US$230 million contract for a major rail contract in Israel to a consortium of Germany’s DB Bahn Bau Gruppe and Israeli companies Shikun & Binui and Lesico. The project comprises three new rail lines with an overall length of 100 kilometres in the north of the country, including track laying, railroad ties and rails, telecommunications and fire detection systems in tunnels. On conclusion of the work, the tracks will be transferred to
  • Texas DOT reselects Atkins toll-plaza contract
    February 28, 2014
    The Texas Department of Transportation (TxDOT) has reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, US$10 million contract, Atkins will provide planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing services for TxDOT toll and managed-lane facilities throughout Texas. TxDOT currently operates more than 493 lan
  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    September 14, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • Egis secures Manchester CAZ contract
    September 3, 2021
    Clean Air Zone will open in UK city next year, with ANPR cameras from Yunex Traffic