Skip to main content

Strabag wins Polish bypass contract

A consortium of Strabag and its subsidiary Heilit and Woerner has been awarded a US$51.7 million design-and-build contract for a 7.6 kilometre bypass around the city of Kościerzyna in northern Poland. The project comprises the construction of three traffic lanes with one additional lane that can be adapted for traffic if needed. It also includes nine civil engineering structures, including bridges and a railway overpass; environmental protection measures such as noise barriers and wildlife crossings; a
September 11, 2014 Read time: 1 min

A consortium of 3861 Strabag and its subsidiary Heilit and Woerner has been awarded a US$51.7 million design-and-build contract for a 7.6 kilometre bypass around the city of Kościerzyna in northern Poland.

The project comprises the construction of three traffic lanes with one additional lane that can be adapted for traffic if needed. It also includes nine civil engineering structures, including bridges and a railway overpass; environmental protection measures such as noise barriers and wildlife crossings; a rainwater drainage system; and the modernisation and construction of access roads. Approximately eight months are scheduled for the planning and 30 months for the construction phase.

For more information on companies in this article

Related Content

  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Jacobs JV awarded contract for California high speed rail
    July 23, 2015
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Fluor consortium named preferred bidder for Netherlands motorway project
    July 1, 2016
    Dutch engineering company Fluor Corporation is part of the 3Angle consortium, a special purpose company selected as the preferred bidder by the Directorate-General for Public Works and Water Management of the Netherlands (Rijkswaterstaat) for the A27/A1 public private partnership (PPP) project in the Netherlands. The 3Angle consortium, comprised of Fluor, Heijmans Capital and 3i Infrastructure, will carry out the design, build, management, maintenance and financing of existing and new infrastructure of t