Skip to main content

Strabag consortium awarded HS2 high speed rail civil engineering contract

The SCS consortium, comprising Strabag, Skanska and Costain has been awarded the main work civil contract packages for lots S1 and S2 of the UK’s new HS2 high-speed railway that will initially link London to Birmingham and later to Leeds and Manchester. The contract is divided into two stages. Stage 1 requires the contractor to design, plan and estimate the works within a period of 16 months, which will serve as the basis for determining the target price for stage 2, the actual construction phase.
August 1, 2017 Read time: 1 min
The SCS consortium, comprising 3861 Strabag, 7136 Skanska and 2002 Costain has been awarded the main work civil contract packages for lots S1 and S2 of the UK’s new HS2 high-speed railway that will initially link London to Birmingham and later to Leeds and Manchester.


The contract is divided into two stages. Stage 1 requires the contractor to design, plan and estimate the works within a period of 16 months, which will serve as the basis for determining the target price for stage 2, the actual construction phase.

The design phase is to be completed in 2018. Construction is scheduled to last until 2023 with the first trains running in 2026.

For more information on companies in this article

Related Content

  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
  • Thales scoops Hong Kong signalling contract
    September 5, 2013
    Thales has been awarded a contract by Hong Kong’s metro operator, MTR Corporation, to provide signalling technology for Shatin to Central Link Phase 1 segment of the Hong Kong metro using a communications-based train control (CBTC) system. To provide fully automatic train operation the contract includes the modernisation of the Ma On Shan Line and West Rail Line lines, where Thales previously installed its CBTC solution in 2003/04.
  • PB wins on-call contract for Detroit-Chicago high speed rail project
    August 3, 2012
    The Michigan Department of Transportation (MDoT) has awarded an on-call contract to Parsons Brinckerhoff for construction services in support of the agency’s efforts to implement accelerated rail services along a high-speed rail corridor between Pontiac/Detroit and Chicago.
  • AVs coming to Florida mobility corridor 
    March 4, 2022
    Jacksonville Transportation Authority project supported by $12.5m grant from USDoT