Skip to main content

Strabag consortium awarded Eisack River undercrossing contract

Construction group Strabag, in a consortium with the Italian construction companies Salini Impregilo, Consorzio Cooperative Costruzioni and Collini Lavori, has been awarded a US$379.5 million contract to build the Eisack Undercrossing section of the Brenner Base Tunnel. Work is scheduled to begin this year with a planned construction time of around eight years. The contract section is located at the southern end of the Brenner Base Tunnel near the town of Franzensfeste (Fortezza) in the Province of Bozen
October 24, 2014 Read time: 2 mins
Construction group 3861 Strabag, in a consortium with the Italian construction companies Salini Impregilo, Consorzio Cooperative Costruzioni and Collini Lavori, has been awarded a US$379.5 million contract to build the Eisack Undercrossing section of the Brenner Base Tunnel. Work is scheduled to begin this year with a planned construction time of around eight years.

The contract section is located at the southern end of the Brenner Base Tunnel near the town of Franzensfeste (Fortezza) in the Province of Bozen (Bolzano) in South Tyrol. The work comprises the construction of the two 4.3 kilometre main tubes of the future Brenner Base Tunnel, as well as two connecting tunnels to the existing Brenner Railway, adaptations and improvements to the existing infrastructure, and the environmental restoration of all areas after construction is completed.

Thomas Birtel, CEO of Strabag, said: “This is an extremely demanding project from a technical point of view, as it undercrosses the river Eisack, the Brenner Motorway, the state highway and the Brenner Railway with a very low rock overburden. We look forward to this challenge.”

For more information on companies in this article

Related Content

  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.
  • Thales Siemens JV wins Spanish high speed rail contract
    August 17, 2015
    Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
  • Ferrovial consortium to build I-77 HOT lanes
    June 30, 2014
    Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol
  • City of Gothenburg awards tram order to Bombardier
    October 12, 2016
    Rail technology supplier Bombardier Transportation and consortium partner Vossloh Kiepe, has been awarded a contract for the supply of 40 Flexity low-floor trams to the city of Gothenburg, Sweden. The contract is valued at approximately US$156 million (€140 million), with an option for up to 60 additional trams. The new trams have been adapted for the city's existing light rail infrastructure and environmental and climate conditions. The vehicles are also equipped with a Vossloh Kiepe propulsion system a