Skip to main content

Strabag consortium awarded Eisack River undercrossing contract

Construction group Strabag, in a consortium with the Italian construction companies Salini Impregilo, Consorzio Cooperative Costruzioni and Collini Lavori, has been awarded a US$379.5 million contract to build the Eisack Undercrossing section of the Brenner Base Tunnel. Work is scheduled to begin this year with a planned construction time of around eight years. The contract section is located at the southern end of the Brenner Base Tunnel near the town of Franzensfeste (Fortezza) in the Province of Bozen
October 24, 2014 Read time: 2 mins
Construction group 3861 Strabag, in a consortium with the Italian construction companies Salini Impregilo, Consorzio Cooperative Costruzioni and Collini Lavori, has been awarded a US$379.5 million contract to build the Eisack Undercrossing section of the Brenner Base Tunnel. Work is scheduled to begin this year with a planned construction time of around eight years.

The contract section is located at the southern end of the Brenner Base Tunnel near the town of Franzensfeste (Fortezza) in the Province of Bozen (Bolzano) in South Tyrol. The work comprises the construction of the two 4.3 kilometre main tubes of the future Brenner Base Tunnel, as well as two connecting tunnels to the existing Brenner Railway, adaptations and improvements to the existing infrastructure, and the environmental restoration of all areas after construction is completed.

Thomas Birtel, CEO of Strabag, said: “This is an extremely demanding project from a technical point of view, as it undercrosses the river Eisack, the Brenner Motorway, the state highway and the Brenner Railway with a very low rock overburden. We look forward to this challenge.”

Related Content

  • Funding approved for US Ohio River Bridges Project
    December 19, 2013
    US Transportation Secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan for US$452 million to finance the Downtown Crossing section of the Louisville and Southern Indiana Ohio River Bridges Project. The cost of the Downtown Crossing, which Kentucky is funding, is around US$1.3 billion, and represents one half of the bi-state Ohio River Bridges project, which also includes the new East End Bridge, also spanning the Ohio River eight miles to the north
  • Consortium named for Pennsylvania PPP bridge project
    January 27, 2015
    A consortium comprising HDR, Plenary Group, Walsh Group and Granite Construction Company has been awarded the contract to replace 558 bridges as part of the Pennsylvania Rapid Bridge Replacement Project in the US. As lead design engineer for the construction joint venture, HDR will be responsible for bridge and roadway design services, environmental permits, right-of-way plan development and construction phase services. The team will begin construction in summer 2015 and complete all bridge replaceme
  • Thales - Balfour Beatty Rail consortium awarded €400 million Danish contract
    March 14, 2012
    Banedanmark, the Danish infrastructure owner, has awarded the Thales - Balfour Beatty Rail consortium, a €400 million contract for the installation of a state-of-the-art European signalling system on nearly 1,200 km of rail lines across Jutland.
  • Pöyry extends rail network maintenance management contract in Eastern Finland
    October 16, 2012
    The urban business group of Finnish consulting and engineering company Pöyry has been awarded a contract from the Finnish Transport Agency for maintenance management of the 1,800 kilometre-long Eastern Finland railway network, which the company has been managing since 2005. The new contract, valued at around US$6.7 million (EUR 5.2 million) commences at the beginning of 2013 and will run for five years. The contract covers the maintenance management of railways, rail structures and equipment, land areas and