Skip to main content

Strabag awarded Polish road construction contracts

Construction group Strabag, via its Polish subsidiaries, has been awarded two contracts totalling US$117 million by Poland’s General Directorate for National Roads and Highways (GDDKiA). As part of the overall works on the S17, Strabag will design and build a 15.2 km long section from the Lubelska junction near Warsaw to Kołbiel, including four junctions, while the second contract comprises the design and construction of an 8.7 km long bypass road near Kołbiel. The S17, which forms part of the E372, w
February 1, 2016 Read time: 2 mins
Construction group 3861 Strabag, via its Polish subsidiaries, has been awarded two contracts totalling US$117 million by Poland’s General Directorate for National Roads and Highways (7570 GDDKiA).

As part of the overall works on the S17, Strabag will design and build a 15.2 km long section from the Lubelska junction near Warsaw to Kołbiel, including four junctions, while the second contract comprises the design and construction of an 8.7 km long bypass road near Kołbiel.

The S17, which forms part of the E372, will link the city of Garwolin with Warsaw and will help to reduce the travel time to the Polish capital and lower the volume of traffic in the surrounding communities. The construction works, which will last until 2019, will include not only the two-to-three-lane cement highway but also rest areas, wildlife crossings and drainage water treatment systems as well as accompanying footpaths and cycle trails.

For more information on companies in this article

Related Content

  • Underinvestment in infrastructure threatens economic growth
    January 24, 2012
    The 2011 Urban Mobility Report from the Texas Transportation Institute highlights the dangers of continued underinvestment in transportation infrastructure but also offers some hope in terms of possible solutions
  • Route options unveiled for new toll link road in Staffordshire
    December 8, 2014
    The Highways Agency has unveiled three possible route options for a new link road between the M54, the northbound M6 and the M6 Toll in Staffordshire. The plans are on show at exhibitions starting today, marking the start of an eight-week public consultation for the scheme, which will reduce congestion on local roads, improve safety and support economic growth in the surrounding area – all part of the government’s long term economic plan. Highway Agency Project Manager Bill Birkett said: “It is import
  • Kapsch wins Latvia traffic contract
    February 9, 2023
    Drivers on E-67 highway around Latvian capital Riga will benefit from real-time info
  • UK government’s US$283 million road building boost for Bedfordshire
    March 4, 2016
    Two road-building schemes worth US$283 million, which are a key part of the UK government’s long-term economic plan for Bedfordshire, are on course to be delivered on time and on budget by spring 2017. The 2.8 mile, US$229 million A5-M1 Link scheme is being delivered by Highways England, while the US$54 million, 1.8 mile Woodside Link project is being completed by Central Bedfordshire Council. The A5-M1 Link dual carriageway project is intended to improve the east-west connection between the A5 and M1