Skip to main content

Strabag awarded Polish road construction contracts

Construction group Strabag, via its Polish subsidiaries, has been awarded two contracts totalling US$117 million by Poland’s General Directorate for National Roads and Highways (GDDKiA). As part of the overall works on the S17, Strabag will design and build a 15.2 km long section from the Lubelska junction near Warsaw to Kołbiel, including four junctions, while the second contract comprises the design and construction of an 8.7 km long bypass road near Kołbiel. The S17, which forms part of the E372, w
February 1, 2016 Read time: 2 mins
Construction group 3861 Strabag, via its Polish subsidiaries, has been awarded two contracts totalling US$117 million by Poland’s General Directorate for National Roads and Highways (7570 GDDKiA).

As part of the overall works on the S17, Strabag will design and build a 15.2 km long section from the Lubelska junction near Warsaw to Kołbiel, including four junctions, while the second contract comprises the design and construction of an 8.7 km long bypass road near Kołbiel.

The S17, which forms part of the E372, will link the city of Garwolin with Warsaw and will help to reduce the travel time to the Polish capital and lower the volume of traffic in the surrounding communities. The construction works, which will last until 2019, will include not only the two-to-three-lane cement highway but also rest areas, wildlife crossings and drainage water treatment systems as well as accompanying footpaths and cycle trails.

For more information on companies in this article

Related Content

  • Kapsch TrafficCom wins further contract in Chile
    September 30, 2015
    Kapsch TrafficCom has secured a new contract in Chile through a subsidiary company. It will implement the tolling system and intelligent transport system (ITS) for the first 15 km of the Ruta 5 Norte, located in the north of Santiago and operated by Sociedad Concesionaria Autopista del Aconcagua (SCADA). The contract, valued at around US$23 million including maintenance services, includes all the technology needed to upgrade a highway section into the urban standard of Santiago, including ten multi-lane
  • Developing Mexico's ITS standards and infrastructure
    February 28, 2013
    Promoting open market conditions for ITS deployment remains a major part of Mexico’s recent infrastructure modernization program. Travis P Dunn, partner at D’Artagnan Consulting, looks at the progress so far. In the past six years, Mexico has embarked on an ambitious infrastructure modernization program, calling for the construction and improvement of more than 19,000km of road infrastructure and the deployment of advanced technologies that improve safety, efficiency, and convenience for road users. One of
  • M62 managed motorway scheme signs switched on
    February 12, 2013
    Work to upgrade part of the M62 in West Yorkshire to a managed motorway, the first scheme in the Yorkshire and Humber region, reached a significant milestone when the first overhead electronic signs went live. For the first time, the variable advisory speed limit signs have come into operation between junctions 27 and 28 to allow the UK Highways Agency to calibrate and test the technology required for the new managed motorway, with the signs being switched on and off in response to traffic conditions. Advis
  • Siemens systems for Nottingham trams, Dubai metro
    March 28, 2014
    Construction work has started on Nottingham's expanding tram network to extend the service to the south and southwest of the city. The extension will more than double the size of Nottingham's tram network with 17.5 kilometres of new track and 28 new tram stops. As part of the project, Siemens will supply and install 33 new ST950 extra low voltage (ELV) junction controllers, eight signalised pedestrian crossings and 80 ELV tram signals. Junction controllers at a number of existing sites will also be upgra