Skip to main content

SSEN seeks views on charging solutions to assist EV transition

Scottish and Southern Electricity Networks (SSEN) is seeking views on proposed electric vehicle (EV) solutions to help avoid potential overloads on local electricity networks caused by sharp increases from the use of these vehicles. The consultation on Managed EV Charging forms part of the company’s Smart EV project. The scheme aims to review and research charging solutions to allow the transition to EVs to take place with minimum disruption to clients while avoiding unnecessary network reinforcement.
March 27, 2018 Read time: 2 mins

Scottish and Southern Electricity Networks (SSEN) is seeking views on proposed electric vehicle (EV) solutions to help avoid potential overloads on local electricity networks caused by sharp increases from the use of these vehicles. The consultation on Managed EV Charging forms part of the company’s Smart EV project.

The scheme aims to review and research charging solutions to allow the transition to EVs to take place with minimum disruption to clients while avoiding unnecessary network reinforcement.

Primarily, the consultation is seeking views on an interim solution for situations where local networks have faulted, or are likely to fault, based on a rapid increase in demand. The proposed solution involves installing a device at both the local substation and, as an option, in domestic properties to monitor load and temporarily adjust EV charging where necessary.
 
Stewart Reid, head of innovation and DSO at Scottish and Southern Electricity Networks said: “Through the Smart EV project, SSEN is working ahead of need to develop a cost-effective, readily-deployable solution to address the challenge of clusters of EVs on our local electricity networks, until such time as long-term market solutions are suitably established.  We welcome any views through the consultation process.”

Tim Nicklin, chair of the Society of Motor Manufacturers and Traders (SMMT)’s EV technical working group added: “SMMT welcomes the Smart EV project and its engaged approach to finding suitable technical solutions. We need to make sure that any solution adopted by industry is future-proof and works with and for the EV driver.”

Related Content

  • October 17, 2019
    Solving Detroit’s jams: just ask a Michigan student
    At the Institute of Transportation Engineers annual meeting, a clever student plan to reduce commute times in Detroit suggests the future of the ITS industry is in good hands, write Pete Spiller and Jarrod Cady A team of students from the University of Michigan won a national student Transportation Technology Tournament - sponsored by the National Operations Center of Excellence (NOCoE) and the US Department of Transportation - with a compelling presentation on reducing congestion. In an impressive d
  • November 30, 2017
    ITS (UK): Shift to emissions free vehicles will make road network funding unsustainable
    Shortfalls in fuel tax caused by moving to emissions-free vehicles will make current ways of funding road networks unsustainable, according to a joint forum between ITS (UK) Road User Charging Interest Group and ITS Ireland hosted by Aecom, Dublin. The group consisted of policy makers, toll operators, payment providers and highway users from seven European countries.
  • March 6, 2018
    Nairobi looks to ITS to ease travel problems
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • March 6, 2018
    Nairobi looks to ITS to ease travel problems
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of