Skip to main content

Sri Lanka to spend US$600 million on first rapid transit metro system

Sri Lanka’s Airport Express Air and Rail (AEAR) is planning to build the first rapid transit metro system in the country at a cost of US$600 million. US-based Louis Berger and India-based KPMG Mumbai have been hired to conduct a technical study and a feasibility study for the project. Construction is scheduled to start in early 2013 after approvals are granted and the studies are completed. The system is scheduled to be operational by 2016.
April 3, 2012 Read time: 1 min
Sri Lanka’s Airport Express Air and Rail (AEAR) is planning to build the first rapid transit metro system in the country at a cost of US$600 million. US-based 4736 Louis Berger and India-based 1981 KPMG Mumbai have been hired to conduct a technical study and a feasibility study for the project. Construction is scheduled to start in early 2013 after approvals are granted and the studies are completed. The system is scheduled to be operational by 2016.

Related Content

  • January 23, 2015
    Alstom wins new Kochi metro line contracts
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour
  • July 25, 2014
    Bogota's metro tender delayed
    The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p
  • January 3, 2025
    $268m FTA grant for San Antonio rapid transit
    Via Rapid Green Line is planned to be up and running by late 2027
  • December 20, 2016
    FTA awards funding to build TEX Rail in Texas
    The US Department of Transportation’s Federal Transit Administration (FTA) has made a US$499 million federal grant agreement with the Fort Worth Transportation Authority (FWTA) to build TEX Rail, a commuter rail line between downtown Fort Worth and the Dallas Fort Worth International Airport. The project will link three of the region’s major activity centres and provide an alternative to travel on the area’s congested roads. The 26.8-mile commuter rail line will serve downtown Fort Worth, the City of Gra