Skip to main content

Sri Lanka to spend US$600 million on first rapid transit metro system

Sri Lanka’s Airport Express Air and Rail (AEAR) is planning to build the first rapid transit metro system in the country at a cost of US$600 million. US-based Louis Berger and India-based KPMG Mumbai have been hired to conduct a technical study and a feasibility study for the project. Construction is scheduled to start in early 2013 after approvals are granted and the studies are completed. The system is scheduled to be operational by 2016.
April 3, 2012 Read time: 1 min
Sri Lanka’s Airport Express Air and Rail (AEAR) is planning to build the first rapid transit metro system in the country at a cost of US$600 million. US-based 4736 Louis Berger and India-based 1981 KPMG Mumbai have been hired to conduct a technical study and a feasibility study for the project. Construction is scheduled to start in early 2013 after approvals are granted and the studies are completed. The system is scheduled to be operational by 2016.

For more information on companies in this article

Related Content

  • Indra to implement high speed rail traffic management system
    September 8, 2014
    State Turkish Rail (TCDD) has awarded Indra a US$55 million contract to implement a planning system for its entire rail network, together with a high-speed train management system. Indra will set up a new control centre in Ankara, equipped with cutting-edge technology, which will carry out operational planning for the country's 12,000 kilometre rail network, both conventional lines and high-speed tracks. In addition, Indra’s DaVinci rail traffic management system will support comprehensive high-speed
  • LA considers free public transit
    October 13, 2020
    Plan to make bus and train travel fareless in LA County to be presented by end of 2020
  • Metro focuses on pavement data 
    December 2, 2021
    Washington State agency says CommonPaths supports pedestrian and accessibility projects 
  • Comprehensive communications combats tolling resistance
    May 19, 2017
    Toll road operator must provide clear, comprehensive and consistent communications to user groups and the local community long before the facility opens. When new tolled highway infrastructure is about to go into service, the construction, management and finance specialists who brought it into being are about ready for a well-deserved celebration. But for the communications and outreach team responsible for building public support for the project – for bringing drivers to the road, and keeping partners and