Skip to main content

SP Group expands Singapore EV chargers

SP Group is expanding its electric vehicle (EV) charger network in Singapore to 200 points, including 52 DC fast chargers. The company says the DC fast chargers will be able to charge an EV in 30 minutes in the Central Business District, Orchard shopping area, the island resort of Sentosa and a planning area in the east region called Paya Lebar. SP is hoping to install 1,000 charging points, of which will be 250 DC chargers by the end of 2020. SP’s head of strategic development, Goh Chee Kiong, sa
October 10, 2019 Read time: 2 mins
SP Group is expanding its electric vehicle (EV) charger network in Singapore to 200 points, including 52 DC fast chargers.


The company says the DC fast chargers will be able to charge an EV in 30 minutes in the Central Business District, Orchard shopping area, the island resort of Sentosa and a planning area in the east region called Paya Lebar.

SP is hoping to install 1,000 charging points, of which will be 250 DC chargers by the end of 2020.

SP’s head of strategic development, Goh Chee Kiong, says the network will reduce “range anxiety and shorten the time needed to charge the vehicles”.

Drivers can use the SP Utilities mobile app to search for the nearest charging points, receive updates on their charging sessions and make a payment.

Landlords involved in the project include CapitalLand Group, City Developments, Lendlease, Resorts World Sentosa and Soilbuild Group Holdings.

Related Content

  • Authorities switch on to all electric buses as costs tumble
    January 9, 2018
    Alan Dron looks at changes in bus propulsion as cities look to improve air quality and seek to reduce maintenance costs. Despite the ending of various incentives to adopt alternative fuels, the introduction of electric buses by US transit authorities is picking up speed as performance improves, costs drop and air quality considerations become increasingly significant. More US bus manufacturers are introducing zero-emission models and some recent contracts will see many more passengers getting their first
  • ABB launches 450kW fast chargers for electric buses, Gothernburg
    November 23, 2017
    ABB has launched a project with Volvo Buses, Västtrafik and Göteborg Energi (GE) to supply two of its 450kW Opportunity Charging systems to charge two high capacity electric-articulated Volvo buses in Gothenburg, Sweden. These fast chargers will be installed at Sahlgrenska University Hospital and Eriksberg Square, on line 16 of the City’s bus network. The order comes after a successful two-year trial under the ElectriCity venture, during which 10 all-electric or partially electrified buses have run on the
  • New guide to EV Charging & Infrastructure
    November 14, 2022
    ITS International's sister website is launching to cover the growing business of EV infrastructure
  • Cost benefit analysis ‘can’t be carried out with a cookbook’
    June 25, 2018
    There is far more to working out the worth of a project than simply filling in a few headings on a spreadsheet. David Crawford surveys some recent thinking from the US and Canada. Cost benefit analysis (CBA) “can’t be carried out with a cookbook”, warns US analyst Professor Robert J Brent. “ You can’t just get out a spreadsheet and fill in the data for all the headings. Each transport CBA should have something that is distinctive, in terms of location (for example, for a rural area), types of user