Skip to main content

South Korea company wins contracts in Nepal

The South-Korean company Chungsuk Engineering has been awarded a contract to prepare the DPR for 136 km of the Bardibas-Simara-Birgunj section of the proposed Nepal's East-West electric Railway, writes Ram Krishna Wagle from Nepal.
March 23, 2012 Read time: 1 min
The South-Korean company Chungsuk Engineering has been awarded a contract to prepare the DPR for 136 km of the Bardibas-Simara-Birgunj section of the proposed Nepal's East-West electric Railway, writes Ram Krishna Wagle from Nepal. The government has asked the company to prepare a detailed design, cost-estimate and bidding documents for the construction of the electric railway based on the feasibility studies submitted by the Rites India a year ago. The Indian company has estimated the project will cost about US$11.11 billion.

Chungsuk Engineering will prepare a detailed design that includes all design and drawing of railway track, electrical traction, power system, signalling and telecom, bridge, culverts, and station building and platform.

Ram Krishna Wagle also reports that the Nepalese government has invited Chungsuk for negotiation for a feasibility study concerning a mass rapid transit (MRT) system, both underground and elevated railway or metro railway system, for Kathmandu Valley. The feasibility for the proposed scheme includes detailed analysis of the existing transport facilities, engineering of the existing transport, engineering requirement and demand analysis of the railway lines, economic and financial resettlement and the project viability on economic cost-benefit evaluation.

Related Content

  • Taking tolling towards new opportunities
    May 18, 2016
    Vinci’s André Broto presented his views on how the tolling industry could play an important role in helping authorities ease urban congestion, to delegates at the IBTTA conference. As director of foresight and strategy at Vinci Autoroutes, France, André Broto has been spending some time considering the future of tolling in his own country and worldwide. He presented his thoughts, which include a very different angle of the causes of, and solutions to, congestion at the IBTTA’s (International Bridge, Tunnel
  • LB Foster wins $60 million Honolulu rail contract
    July 27, 2012
    Pennsylvania-based LB Foster Company has been awarded the company’s largest rail products contract, valued at approximately US$60 million, by contractor Kiewit/Kobayashi, a joint venture for the county-wide construction of the Honolulu Authority for Rapid Transportation (HART) passenger transit system. LB Foster rail, concrete ties, direct fixation fasteners, third rail with accessories and special trackwork will be installed throughout the Honolulu Rail Transit project’s new elevated railway system and mai
  • Peru lines up road, rail concessions for 2015
    November 20, 2014
    Peru plans to award next year infrastructure concessions including rail and road projects. Hydro and thermal power plants and liquefied petroleum gas distribution in the capital are also being lined up, a senior government official has said. Concessions will include the fourth stretch of the Longitudinal de la Sierra highway, which calls for the construction, operation and maintenance of a 640 kilometre stretch of Peru's Longitudinal de la Sierra highway, connecting Huancayo, Izcuchaca, Mayoc and Ayacuch
  • Texas toll road contract awarded
    March 2, 2015
    The Texas Transportation Commission has awarded a contract to the Blueridge Transportation Group for the the planning, construction, financing, operation and maintenance of an express toll road and additional infrastructures for the SH 288 toll lanes project in Harris County in Texas. The consortium includes Israel-based Shikun & Binui Holdings, together with an infrastructure contractor and a financial investor. The ten mile stretch of road will connect Harris County to Houston. The project includes constr