Skip to main content

SolaRoad performs better than expected

The first six months of the pilot phase of SolaRoad, the first road in the world to generate solar power, have produced an energy yield beyond expectations, according to its Dutch developer, TNO. The cycle road, installed in Krommenie in the Netherlands, has already generated over 3,000 kWh. "We did not expect a yield as high as this so quickly,” says Sten de Wit, spokesman for SolaRoad. “This can provide a single-person household with electricity for a year, or power an electric scooter to drive of
May 8, 2015 Read time: 2 mins
The first six months of the pilot phase of SolaRoad, the first road in the world to generate solar power, have produced an energy yield beyond expectations, according to its Dutch developer, 7087 TNO.

The cycle road, installed in Krommenie in the Netherlands, has already generated over 3,000 kWh.

"We did not expect a yield as high as this so quickly,” says Sten de Wit, spokesman for SolaRoad.  “This can provide a single-person household with electricity for a year, or power an electric scooter to drive of 2.5 times around the world. If we translate this to an annual yield, we expect more than the 70 kWh per square meter per year, which we predicted as an upper limit in the laboratory stage. We can therefore conclude that it was a successful first half year.”

SolaRoad is around 70 metres long and consists of a cycle path constructed of concrete modules of 2.5 to 3.5 metres. In one lane, solar cells are installed underneath a tempered glass top layer of approximately 1 cm thickness, covered by a transparent and skid resistant coating. There are no solar cells embedded in the other lane, which is used for reference and to test various coatings. The solar electricity from the road is fed into the electricity grid and can be used, for example, for street lighting, traffic systems, households and eventually electric cars that drive over it.

For more information on companies in this article

Related Content

  • Turkey’s Gebze-Izmir motorway gets under way
    July 17, 2015
    Gebze İzmir İşletme ve Bakım (GİİB) has begun work on the 22-year contract for the Gebze-Izmir motorway in Turkey and will be responsible for pre-operational services, operation, maintenance and toll management on behalf of Otoyol, the concessionaire for the Turkish General Directorate of Highways (KGM). Egis is a 50 per cent shareholder in GIIB, along with shareholders of the concession company. The Gebze-İzmir project is a toll motorway procured by KGM under a build, operate and transfer (BOT) model.
  • Platooning with Ease on the I-70
    July 15, 2025
    What would happen to truck platooning - a nascent technology - if the weather turns nasty? The I-70 Truck Automation Corridor Project in the northern US should provide some answers, reports David Arminas…
  • ITS adaptions enhance cycle safety in Dublin
    December 3, 2013
    Enabled and enforced by innovative use of ITS, Dublin’s new off-road cycle route is proving a hit with commuters, leisure cyclists and walkers alike as Brendan O’Brien explains. Dublin City Council’s vision is to create a city where people of all ages and abilities have the confidence, incentive and facilities to cycle. On-road cycle lanes had already been incorporated into the Quality Bus Corridors design and there is a mix of on- and off-road cycle routes. However, in 2010 the Council began work on a new
  • Plug and play approach unifies workzone ITS
    July 18, 2012
    Caltrans District 7 is finalising a ConOps document which will detail a plug-and-play to work zone ITS operation. The organisation's Allen Z. Chen elaborates. Before August is out, on current planning, the California Department of Transportation (Caltrans) District 7 (which covers Los Angeles and Ventura Counties, with a combined population of close to 11 million people) intends to have finalised a Concept of Operations (ConOps) document dealing with Work Zone Transportation Management Systems (WZTMS). The