Skip to main content

Solar road studs aid night time road safety on the M20

UK company, Astucia, part of the Clearview Traffic Group, and Balfour Beatty Mott MacDonald has installed over 4,000 Astucia SolarLite road studs on the M20 junctions 8 to 9 between Ashford and Maidstone, on behalf of the UK Highways Agency. This section of the motorway lacks street lighting increasing the potential risk for night time accidents. The project involved upgrading the existing road markings and road studs to address the high number of collisions recorded in the dark and wet conditions. The exis
October 23, 2012 Read time: 2 mins
UK company, 1875 Astucia, part of the 557 Clearview Traffic Group, and 3902 Balfour Beatty 1869 Mott MacDonald has installed over 4,000 Astucia SolarLite road studs on the M20 junctions 8 to 9 between Ashford and Maidstone, on behalf of the 1841 UK Highways Agency.

This section of the motorway lacks street lighting increasing the potential risk for night time accidents. The project involved upgrading the existing road markings and road studs to address the high number of collisions recorded in the dark and wet conditions. The existing traditional retro-reflective studs, many of which had become faulty, were removed and replaced with over Astucia SolarLite road studs.

Astucia claim their road studs have demonstrated that they can form the future of traffic safety by providing enhanced safety for road users reducing night time casualties by up to 70 per cent.  The M20 installation joins other equally vital and environmentally conscious installations already seen on the A20 in the county fondly known as the Garden of England.

Astucia managing director Nick Lanigan states “This is a superb example of the type of scenario where installing Astucia SolarLite road studs will make a real difference to the safety record and the public perception of their safety whilst travelling on this section of the M20 motorway. These unique studs significantly improve lane and road layout visibility during the hours of darkness, resulting in drivers adjusting their driving speed and behaviour and reducing the amount and severity of night time accidents.”

Related Content

  • August 25, 2021
    TTF confirms traffic signal funding recipients
    TTF found traffic signals with faulty detectors and equipment 
  • December 5, 2018
    England’s first motorway celebrates 60th birthday with ITS upgrade
    Sixty years today, 2,300 drivers drove along an eight-mile section of road in England – the first motorway in the country. Opened in 1958, the Preston bypass – now part of the M6 - only had two lanes in each direction, with no safety barrier in the central reservation. There was also no technology – not even simple electronic signs. Highways England is pledging to celebrate the birthday by completing four upgrades on the M6 by spring 2022. The £900m project will add extra lanes and better technolog
  • September 22, 2014
    TfL opts for RedSpeed safety cameras
    RedSpeed International is to supply around 600 speed and red light safety cameras to Transport for London (TfL). The award is the result of a process which started in August 2012 and will see the company’s SpeedCurb and RedSpeed products progressively installed with a completion date of October 2016. The installation of the RedSpeed digital red light camera replacement in London has already started. The cameras not only enforce against red light running, but also monitor and enforce against vehicles brea
  • May 26, 2016
    Vehicle to improve safety and reduce disruption on motorways
    Inspired by the aviation industry, a new vehicle developed by Highways England to help replace overhead signs is set to reduce the duration of roadworks. The vehicle is based on the design of an aircraft catering vehicle, which loads refreshments into aeroplanes using a hydraulic scissor lift. Traditionally, signs are taken down and installed using a flat-bed truck, crane and cherry picker, taking up to 40 minutes. However the new Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 min