Skip to main content

SmartStation group reveal the importance of intelligent stops

A SmartStation research and design project has worked with PTV Group and Raumobil to develop ideas on how to turn analogue stops into digital hubs, in Karlsruhe. The scheme, commissioned by the Federal Ministry of Transport and Digital Infrastructure, set out to reveal the importance of networked stations for multimodal mobility. The initiatives 18-month research phase identified that intelligent stops that include analogue facilities such as information terminals, escalators, elevators and lockers need to
March 13, 2018 Read time: 2 mins

A SmartStation research and design project has worked with %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external PTV Group PTV Group website link false https://www.ptvgroup.com/en/ false false%> and Raumobil to develop ideas on how to turn analogue stops into digital hubs, in Karlsruhe. The scheme, commissioned by the Federal Ministry of Transport and Digital Infrastructure, set out to reveal the importance of networked stations for multimodal mobility.

The initiatives 18-month research phase identified that intelligent stops that include analogue facilities such as information terminals, escalators, elevators and lockers need to be turned into systems that can communicate.

Annette Kindl, project manager for PTV’s research team, said: “All relevant data will be integrated into the Smartstation network in real time via a standard protocol. Travellers can use an app to log into the so-called Infosphere, i.e. the immediate environment of a smartStation, in order to access the desired information and services. All modes of transport can thus be used intelligently and comfortably as well as energy-efficiently and cost-effectively.”

A smart station, according to Christian Reuter, project manager at PTV Transport Consult, integrates infrastructure and all kinds of services, which includes information on elevator problems or safe places for children to stay in the event of disruptions in local transport.

The group recognised that challenges surrounding different standards, platforms and digital services need to be interconnected and that stakeholders from different areas need to be involved in the process.

“Given the ongoing digitisation in the field of urban mobility, the smartStation is only the next logical step. In the course of the research project, we have made initial assessments and started the discourse on digitisation of stops/stations. Now it is time to continue the dialogue with all relevant stakeholders, to turn the idea into a conceptual design and to encourage the launch of pilot projects”, Kindl added.

Related Content

  • Viajeo Plus sustainable urban mobility showcase
    October 31, 2014
    Viajeo Plus, an EC funded FP7 international cooperation project for implementation of innovative and efficient urban mobility solutions, has organised a City Showcase in Chengdu Heritage Park, China, on 11 November. The event aims at facilitating knowledge exchange and experience sharing between China and Europe on sustainable urban mobility. It will gather technical experts, policy makers and researchers to present their achievements on sustainable urban mobility solutions, to discuss their needs and to
  • Colorado DOT and partners to unveil self-driving work zone vehicle
    August 10, 2017
    US manufacturer of TMA (truck mounted attenuator) trucks Royal Truck & Equipment is to unveil the Colorado Department of Transportation (CDOT) autonomous attenuator truck, along with partners at Colas UK, and Micro Systems. This work zone vehicle has been designed to revolutionise safety for roadway maintenance crews. Usually positioned behind road construction crews in order to protect workers from the travelling public, the Autonomous Impact Protection Vehicle (AIPV) is a self-driving TMA truck that incre
  • Copenhagen light rail JV appointed
    February 13, 2015
    Copenhagen metro operator Metroselkabet has appointed Arup as part of a joint venture with Rambøll to develop the light rail on ring 3 for greater Copenhagen. The new light rail system includes a double track alignment of 27 kilometres and 27 stations with a rolling stock fleet of 27 light rail vehicles. This major project was planned to promote the use of public transport as well as encourage the urban development along the route and the passage across the city to avoid interchanging in the centre.
  • CHAMP final workshop
    June 12, 2014
    The European Cycling Heroes Advancing sustainable Mobility Practice (CHAMP) project will come to an end in September 2014. The final workshop takes place in Gent, Belgium on 11-12 September. The CHAMP project brings together leading cities in the field of cycling. Within the project, they have looked at innovative ways to further boost cycling in their cities and enhance local policies. CHAMP has developed and tested a performance analysis tool, building on self-analysis as well as peer review by ot