Skip to main content

Singapore upgrading MRT for better reliability

Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator SMRT.
May 9, 2012 Read time: 1 min
Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the 918 Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator 5465 SMRT.

The 7.5km Tuas West Extension will feature four stations, which include one close to the Second Link, as well as a new depot to take in more train fleet. It’s claimed the extension, scheduled to become operational in 2016, will help reduce travelling time by as much as 35 minutes.

By 2014, the North-South line will have 13 additional trains and by 2016, the East-West line will have 22 more trains. From 2015, 24 new trains will join the new Circle Line, while 18 trains will be added to the North-East line.

For more information on companies in this article

Related Content

  • Thales signs deals with China, Korea, Turkey
    June 15, 2020
    French firm closes three signal control contracts for urban rail systems
  • UK government’s US$283 million road building boost for Bedfordshire
    March 4, 2016
    Two road-building schemes worth US$283 million, which are a key part of the UK government’s long-term economic plan for Bedfordshire, are on course to be delivered on time and on budget by spring 2017. The 2.8 mile, US$229 million A5-M1 Link scheme is being delivered by Highways England, while the US$54 million, 1.8 mile Woodside Link project is being completed by Central Bedfordshire Council. The A5-M1 Link dual carriageway project is intended to improve the east-west connection between the A5 and M1
  • Multi-modal’s long road into the transportation mainstream
    June 4, 2015
    Andrew Bardin Williams looks at 20 years of multimodal transport in the Sun Belt and beyond and the key requirement for user engagement. Phoenix residents will head to the polls in August to decide whether to implement a three-tenths of a cent sales tax to fund the city’s new multimodal transportation plan. It will be the second transportation-related sales tax hike in the past 15 years yet city officials and advocates expect the resolution to easily pass—despite the strong anti-tax environment that has dom
  • Auckland’s Waterview Tunnel to open
    June 22, 2017
    Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.