Skip to main content

Singapore upgrading MRT for better reliability

Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator SMRT.
May 9, 2012 Read time: 1 min
Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the 918 Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator 5465 SMRT.

The 7.5km Tuas West Extension will feature four stations, which include one close to the Second Link, as well as a new depot to take in more train fleet. It’s claimed the extension, scheduled to become operational in 2016, will help reduce travelling time by as much as 35 minutes.

By 2014, the North-South line will have 13 additional trains and by 2016, the East-West line will have 22 more trains. From 2015, 24 new trains will join the new Circle Line, while 18 trains will be added to the North-East line.

For more information on companies in this article

Related Content

  • Tolling industry volunteers help Oklahoma boys find ‘home’
    August 19, 2015
    IBTTA volunteers restore and upgrade facilities at an Oklahoma boys home during its annual Maintenance & Roadway Operations Workshop. Oklahoma receives an average of 55 tornado strikes each year. Some are small; others are huge and violent. All inspire fear. “It sounded like a freight train was headed for my house.” That’s how people often describe the sound they hear just befo
  • Free-flow upgrade to Holland's Westerschelde tunnel's toll system
    February 1, 2012
    Unbroken service Technolution's Winifred Roggekamp and Dave Marples describe efforts to upgrade the Westerscheldetunnel's tolling system to give free-flow capability. Until 2003 the Flanders region of Zeeland, in the south-west of the Netherlands, was connected to the mainland only by ferry. The new Westerscheldetunnel, a 6.6km toll tunnel, improves communications with the region considerably, taking some 100km off the alternative road journey. In 2006 it was recognised that the toll plaza for the tunnel ne
  • Bridging the highway travel information gap
    March 14, 2012
    A new traffic management solution is attempting to bridge the gap in information available on freeways and arterial roadways. Andrew Bardin Williams reports. Agencies responsible for national networks of roads around the world have the ability to measure, analyse and disseminate accurate travel information to drivers. Millions of dollars go into data collection infrastructure to collect traffic congestion and travel time information on major freeways or highways. For example, a driver on the I-210 in the Lo
  • Integrated transport network proposed for Montréal
    April 25, 2016
    DPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, has unveiled for its Réseau électrique métropolitain (REM), an integrated public transportation project. Under the proposal, the REM will link downtown Montréal, the South Shore, the West Island (Sainte-Anne-de-Bellevue), the North Shore (Deux-Montagnes) and the airport in a unified, fully automated, 67km light rail transit (LRT) system comprising 24 stations and operating 20 hours a day, 7 days a week. The solution proposed by CDPQ Infra wi