Skip to main content

Singapore upgrading MRT for better reliability

Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator SMRT.
May 9, 2012 Read time: 1 min
Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the 918 Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator 5465 SMRT.

The 7.5km Tuas West Extension will feature four stations, which include one close to the Second Link, as well as a new depot to take in more train fleet. It’s claimed the extension, scheduled to become operational in 2016, will help reduce travelling time by as much as 35 minutes.

By 2014, the North-South line will have 13 additional trains and by 2016, the East-West line will have 22 more trains. From 2015, 24 new trains will join the new Circle Line, while 18 trains will be added to the North-East line.

Related Content

  • April 9, 2014
    Gothenburg’s year of congestion charging
    A year after it went live, Colin Sowman examines the technology used for Gothenburg’s congestion charging system and the effect the scheme has had on commuters. When it comes to long-term planning, the Scandinavians take some beating.The West Swedish Agreement is a case in point. Introduced in 2009, the Agreement runs through to around 2027 and aims to create an attractive, sustainable and growing region, and over that timescale the number of journeys is expected to increase by a third. Therefore the Agreem
  • December 18, 2015
    Thales to upgrade Greater Cairo Metro
    More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
  • October 15, 2015
    Singapore unveils roadmap for self-driving vehicles
    Singapore's Ministry of Transport (MOT) and Land Transport Authority (LTA) have unveiled plans to start trialling self-driving vehicles, claiming this is another step towards the country’s long-term vision of deploying self-driving vehicles and mobility concepts to enhance and complement its multi-modal land transport system. Self-driving vehicle trials have already commenced in a 200 hectare business park and are expected to start in another area in December. The tests will be carried out by the Institu
  • January 10, 2013
    ST Electronics secures significant transportation contracts
    Singapore-based ST Electronics has been awarded transportation contracts valued at a combined total of US$156.21 million. The company is to implement the second phase of the Expressway Monitoring and Advisory System (EMAS) on major arterial roads under a contract awarded by the Land Transport Authority (LTA). Under this project, which is due to be completed by 2014, the EMAS will be expanded to four major arterial corridors in the island republic that serve as the expressways' alternative routes. In another