Skip to main content

Singapore upgrading MRT for better reliability

Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator SMRT.
May 9, 2012 Read time: 1 min
Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the 918 Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator 5465 SMRT.

The 7.5km Tuas West Extension will feature four stations, which include one close to the Second Link, as well as a new depot to take in more train fleet. It’s claimed the extension, scheduled to become operational in 2016, will help reduce travelling time by as much as 35 minutes.

By 2014, the North-South line will have 13 additional trains and by 2016, the East-West line will have 22 more trains. From 2015, 24 new trains will join the new Circle Line, while 18 trains will be added to the North-East line.

For more information on companies in this article

Related Content

  • £36bn from scrapped HS2 to be spent on 'transport projects' in England
    October 4, 2023
    Money from scaled-back high-speed rail project will be reallocated, insists Rishi Sunak
  • Record-breaking year for US toll facilities, says IBTTA
    April 1, 2016
    Last year (2015) was a record-breaking year for toll road, bridge and tunnel usage according to a new report from the International Bridge, Tunnel and Turnpike Association (IBTTA). The National Toll Facilities Usage Analysis found that drivers' use of toll roads increased by seven per cent between 2014 and 2015, a record-breaking rate of growth that puts tolling usage on pace to double in less than ten years, says IBTTA. The analysis was compiled by collecting data from 31 toll-operated facilities acros
  • Global smart railways system - increased adoption of analytics and big data
    March 30, 2015
    The Global Smart Railway System market is predicted to grow at a CAGR of 26.76 per cent over the period 2014-2019, according to Research and Markets’ latest report, Global Smart Railways System Market 2015-2019. The report has been prepared based on an in-depth market analysis with inputs from industry experts. It covers the APAC region, Europe, Latin America, the Middle East, and North America; it covers the Global Smart Railway System market landscape and its growth prospects in the coming years and inclu
  • Thales record Korea deployment
    May 29, 2012
    Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012. The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales