Skip to main content

Siemens to provide EV charging for Virginia commuter park and ride facility

Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.
May 21, 2012 Read time: 1 min
189 Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.

As part of the contract, Siemens will install five multi-level charging stations. These are dual output stations designed for public outdoor applications that can deliver Level II charging and Level I charging through two separate outputs. The devices will be equipped with connectivity via the 4825 ChargePoint Network, an open-system EV charging network that allows access to all manufacturers of vehicle charging stations, provides 24/7 station monitoring and driver support and is claimed to be the only charging network with mobile apps for real-time station status and charging notifications.

For more information on companies in this article

Related Content

  • LAMetro and Via launch ride-sharing service at three metro stations
    February 8, 2019
    The Los Angeles County Metropolitan Transportation Authority (LAMetro) has partnered with Via to offer a ride-sharing service to and from three metro stations. The one-year pilot, supported by a $1.3 million grant from the Federal Transit Administration, is being trialled at Artesia, El Monte and North Hollywood. Daniel Ramot, CEO and co-founder of Via, says the company’s passenger matching and vehicle routing algorithm will connect customers with the three transit hubs in their communities. Rid
  • Ola implements kiosks at Dehli Division railway stations
    March 5, 2018
    Indian ride-sharing company Ola has launched its kiosk at five railway stations in the Dehli Division to help facilitate last mile connectivity and improve the overall mobility experience for daily commuters. Passengers can now book a cab with the assistance of Ola representatives at kiosks within the premises. Ola Zones have also been set up at each station to offer cabs dedicated parking to help ease traffic issues. These zones will serve as a dedicated pick up / drop points with the intention of
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.
  • Autopilot highlights shape of Things
    March 30, 2020
    Driverless vehicles require rich data to operate safely, and a European consortium is harnessing the Internet of Things to help.