Skip to main content

Siemens to provide EV charging for Virginia commuter park and ride facility

Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.
May 21, 2012 Read time: 1 min
189 Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.

As part of the contract, Siemens will install five multi-level charging stations. These are dual output stations designed for public outdoor applications that can deliver Level II charging and Level I charging through two separate outputs. The devices will be equipped with connectivity via the 4825 ChargePoint Network, an open-system EV charging network that allows access to all manufacturers of vehicle charging stations, provides 24/7 station monitoring and driver support and is claimed to be the only charging network with mobile apps for real-time station status and charging notifications.

For more information on companies in this article

Related Content

  • POD Point partners with Nissan GB on EV charging
    May 19, 2016
    Electric vehicle charging company POD Point has become an approved supplier of home electric vehicle (EV) charging solutions for Nissan GB, the manufacturer of the Leaf electric car, which has sold over 12,000 in the UK. POD Point’s new status as an approved home charging unit supplier means that anyone purchasing a Nissan plug-in vehicle will be able to easily access a charge point for their home. The POD Point Solo is a reliable home charge unit which can be installed within ten working days. POD Po
  • Future of tolling: the priorities
    January 14, 2020
    In the final part of his investigation into the future of tolling technology, Josef Czako of Moving Forward Consulting asks what industry figures see as the priorities going forward…
  • ABB delivers 20 EV chargers to Egypt
    July 16, 2019

    4540 ABB is supplying 20 DC fast chargers across Egypt which it says can recharge electric vehicles (EVs) in 15 minutes.

    The company says the deployment supports Egypt’s plans to reduce air pollution by 50% by 2023.

    The Terra 53 DC fast chargers are being installed at National Petroleum Company gas stations across the country’s road network, car dealerships and busy urban areas.

    Each charger comes with ABB Ability connected services, which continuously collects data to remotely monitor and control the operation of the chargers.

  • First electric car ferry goes into operation in Norway
    May 19, 2015
    The world’s first electrical car and passenger ferry powered by batteries has entered service in Norway. The unique solution is a result of a competition that Ministry of Transport and Communications and the Norwegian Public Roads Administration launched in 2010. The ferry only uses 150 kWh per route, which corresponds to three days use of electricity in a standard Norwegian household. Built in conjunction with shipbuilder Fjellstrand, Siemens installed the complete electric propulsion system and install