Skip to main content

Siemens to provide EV charging for Virginia commuter park and ride facility

Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.
May 21, 2012 Read time: 1 min
189 Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.

As part of the contract, Siemens will install five multi-level charging stations. These are dual output stations designed for public outdoor applications that can deliver Level II charging and Level I charging through two separate outputs. The devices will be equipped with connectivity via the 4825 ChargePoint Network, an open-system EV charging network that allows access to all manufacturers of vehicle charging stations, provides 24/7 station monitoring and driver support and is claimed to be the only charging network with mobile apps for real-time station status and charging notifications.

For more information on companies in this article

Related Content

  • Siemens SafeZone switched on in the Netherlands
    May 29, 2014
    An inter-urban version of Siemens’ SafeZone speed enforcement system has been deployed and switched on in the Netherlands this month to discourage motorists from exceeding 80 kph on two sections of the A13 motorway, the main arterial route between Rotterdam and The Hague. Modified for the Dutch market, the award-winning solution was designed, supplied and installed by Siemens for the Ministry of Justice, Netherlands and will be serviced for a period of eight years. Based on automatic number plate re
  • Scania to test electric trucks and buses in real-life conditions
    June 9, 2015
    In February 2016, Scania will begin testing electric trucks as part of the Swedish Gävle Electric Road project, which will demonstrate and evaluate conductive technology, using electric transmission through overhead lines above vehicles equipped with a pantograph power collector. The Swedish Transport Administration has now approved support for the project, which is in line with the Government’s goal of an energy-efficient and fossil-free vehicle fleet by 2030. The project consists of about US$9.2 millio
  • Greenlots and Volvo Trucks to install EV chargers in California
    November 15, 2018
    Technology company Greenlots has partnered with Volvo Trucks to implement an electric vehicle (EV) charging infrastructure for fleets operating out of warehouses in southern California. The project is part of a public-private partnership, in which the California Air Resources Board (CARB) awarded $44.8 million to the South Coast Air Quality Management District. The funded was used for Volvo’s Low Impact Green Heavy Transport Solutions (LIGHTS) project. As part of LIGHTS, Greenlots will equip warehouses
  • West Coast Electric Highway now extends to Canadian border
    May 31, 2012
    The border-to-border vision of the West Coast Electric Highway moved closer to becoming a reality this week with the opening of new EV charging sites, extending the highway to the Canadian border and opening it to electric vehicle (EV) drivers from both countries. The Washington State Department of Transportation (WSDoT), along with electric charging station partner AeroVironment opened ten new public charging stations—seven along Interstate 5 and three along US Route 2 in northern Washington – that provide