Skip to main content

Siemens to provide EV charging for Virginia commuter park and ride facility

Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.
May 21, 2012 Read time: 1 min
189 Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.

As part of the contract, Siemens will install five multi-level charging stations. These are dual output stations designed for public outdoor applications that can deliver Level II charging and Level I charging through two separate outputs. The devices will be equipped with connectivity via the 4825 ChargePoint Network, an open-system EV charging network that allows access to all manufacturers of vehicle charging stations, provides 24/7 station monitoring and driver support and is claimed to be the only charging network with mobile apps for real-time station status and charging notifications.

For more information on companies in this article

Related Content

  • NTU and M1 to develop Singapore 5G C-V2X testbed
    November 14, 2019
    Nanyang Technological University (NTU) in Singapore is working with M1 to integrate 5G technology into its cellular Vehicle to Everything (C-V2X) research testbed.
  • Meeting the challenges of smartcard fare payment
    July 4, 2012
    David Crawford monitors a growing trend in contactless smartcard ticketing The north east United States has become a hive of activity in the smart fare payment arena. In October 2011, the New York Metropolitan Transportation Authority (MTA) published, as a preliminary to an imminent procurement process, the detailed concept of its New Fare Payment System (NFPS). Based on open payment industry standards, this is designed to be implemented on all MTA bus and subway services operated by New York City Transit (
  • The bus to IP access control has left the station
    April 9, 2014
    David Lenot examines how mass transit agencies can benefit from IP access control and the features required to ensure a sound investment. With millions of commuters relying on their services daily, mass transit agencies are faced with the unfortunate reality that their operations are susceptible to threats. A single incidence of unauthorised access to restricted areas and buildings could be the catalyst to damaged property, endangered lives or other unfortunate events. Unlike an international airport
  • City EV selects OTI's to provide cashless payment solution for EV charging station
    November 21, 2017
    CityEV has chosen OTI’s Uno 6 Ultra Compact NFC Contactless Reader as the cashless payment solution for its Cityline 100 electric vehicle (EV) charging stations. The CityEV ChargePoint network is a part of a network system, with the latest protocol version offering both local and smart charging, where charging on multiple charge points is limited to a certain power limit and central smart charging which is managed by the central system.