Skip to main content

Siemens to provide EV charging for Virginia commuter park and ride facility

Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.
May 21, 2012 Read time: 1 min
189 Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.

As part of the contract, Siemens will install five multi-level charging stations. These are dual output stations designed for public outdoor applications that can deliver Level II charging and Level I charging through two separate outputs. The devices will be equipped with connectivity via the 4825 ChargePoint Network, an open-system EV charging network that allows access to all manufacturers of vehicle charging stations, provides 24/7 station monitoring and driver support and is claimed to be the only charging network with mobile apps for real-time station status and charging notifications.

For more information on companies in this article

Related Content

  • Lidar: recipes for success
    March 28, 2022
    Lidar is being deployed all over the world - and you can even read a cookbook on the subject...
  • Siemens marks a decade of involvement with congestion charging in London
    February 21, 2017
    Siemens ITS has reached a major milestone in its relationship with London’s congestion charging system since the contract was awarded in 2005. On 19 February 2017, the system run by Siemens has been live and operational for 10 years and during this time over two billion vehicle detection records have been processed, all with security and transactional integrity resulting in high driver compliance. The system uses multi-lane free flow tolling technology which extends throughout London with more than 1,300
  • Canada invests in Alberta EV chargers
    February 22, 2022
    They will be installed on street locations and at recreation centres across province
  • Delivering accurate bus information
    July 27, 2012
    John C. Toone, King County Metro, describes the transition to an IntelliDrive-led approach to communication and information sharing in line with the introduction of a new bus rapid transit service. King County Metro (KC Metro), which serves Seattle, Bellevue and over 20 suburban towns, has been active in the development of intelligent transportation systems for many years. It has operated a signpost-based AVL system for more than a decade and has used this to provide bus location information to the public o