Skip to main content

Siemens to provide EV charging for Virginia commuter park and ride facility

Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.
May 21, 2012 Read time: 1 min
189 Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.

As part of the contract, Siemens will install five multi-level charging stations. These are dual output stations designed for public outdoor applications that can deliver Level II charging and Level I charging through two separate outputs. The devices will be equipped with connectivity via the 4825 ChargePoint Network, an open-system EV charging network that allows access to all manufacturers of vehicle charging stations, provides 24/7 station monitoring and driver support and is claimed to be the only charging network with mobile apps for real-time station status and charging notifications.

For more information on companies in this article

Related Content

  • Greenlots to provide EV chargers for Columbus Yellow Cabs
    May 24, 2019
    Greenlots, a Shell New Energies subsidiary, is to install DC fast charging stations at Columbus Yellow Cab’s depot facilities and several routes throughout central Ohio. Greenlots says the technology will allow Yello Cab operators to reduce charging times for its electric taxis, monitor the fleet in real-time and increase utilisation of each vehicle. Morgan Kauffman, CEO at Yellow Cab, says: "With this project, we're showing local residents that EVs are a viable substitution for traditional internal com
  • Less travel aggravation to blunt Aggieland fans’ motivation
    June 17, 2016
    Returning travel times to normal within two hours of the end of a major football game was the challenge facing College Station, Adam Lyons explains how this was achieved. College Station, TX, also known as ‘Aggieland’, is located right in the middle of the Dallas/Fort Worth, San Antonio and Houston triangle making the city accessible to over 14 million Texans within less than a four-hour drive. One of the biggest draws to this area is Texas A&M University (TAMU) and the Aggie football games in the fall, mea
  • US Cities push for smarter poles
    June 25, 2018
    US Cities The need to connect existing infrastructure has led various US transit authorities into imaginative alleyways: David Crawford examines some new roles for street furniture. US cities are vying with each other in developing schemes to create a new generation of connected places. Their strategies include taking advantage of their streetlight poles’ height and ubiquity to give them new roles in supporting intelligent nodes. They are now being equipped for collecting real-time data on key transport
  • Greener transit via Maryland microgrid
    November 7, 2022
    Arup is involved in Montgomery County smart energy project in Maryland, US