Skip to main content

Siemens to provide EV charging for Virginia commuter park and ride facility

Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.
May 21, 2012 Read time: 1 min
189 Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.

As part of the contract, Siemens will install five multi-level charging stations. These are dual output stations designed for public outdoor applications that can deliver Level II charging and Level I charging through two separate outputs. The devices will be equipped with connectivity via the 4825 ChargePoint Network, an open-system EV charging network that allows access to all manufacturers of vehicle charging stations, provides 24/7 station monitoring and driver support and is claimed to be the only charging network with mobile apps for real-time station status and charging notifications.

For more information on companies in this article

Related Content

  • Bosch trials park and ride app with city of Stuttgart
    December 15, 2015
    Verband Region Stuttgart (Stuttgart regional association) and Robert Bosch are to launch an pilot active parking lot management project to provide drivers with real time parking information via an app or online. Fifteen park and ride facilities to be equipped with Bosch occupancy sensors to identify unoccupied parking spaces on a minute-by-minute basis and communicate this information in real time via the VVS Transit and Tariff Association Stuttgart app and website. Eleven cities and communities in the
  • Rapid growth of bus rapid transit schemes on US Pacific coast
    January 27, 2012
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • Buses services benefit from seamless Wi-Fi data transfer
    April 9, 2014
    Ted Bowser explains how the almost total Wi-Fi coverage at Ride-On’s new bus garage is providing big benefits for the operator and passengers alike. The ability to download and upload data to and from the various systems on board buses has become central to mass transit operators’ business model. So when Ride-On, the public transportation system in Maryland’s Montgomery County, was moving one of its three depots into a bigger and purpose-built facility, connectivity was a key consideration.
  • EV charging companies partner to expand London’s EV charging
    October 21, 2016
    ChargePoint Services and BluepointLondon are to collaborate to expand the number of electric vehicle (EV) rapid chargers across London. The companies’ respective networks, GeniePoint and Source London, will also offer full inter-operability to their respective members. They say commercial EV operators who will be able to recharge vehicles in 20-40 minutes to keep their vehicles moving throughout the working day and night. For the first phase, the two companies aim to have around 30 new rapid charger