Skip to main content

Siemens to equip Line 4 of Paris Metro for driverless operation

Siemens received an order from the Paris public transport operator RATP (Régie Autonome des Transports Parisiens) to equip the 27 stations of Paris Metro the twelve kilometre Line 4 with signalling and operations control systems. Siemens will supply its Trainguard MT automatic train control system that uses communications-based technology to achieve fully automatic, driverless operation. All train movements will be supervised via the operation control centre, which will also be supplied by Siemens. Spec
January 12, 2016 Read time: 2 mins
189 Siemens received an order from the Paris public transport operator RATP (Régie Autonome des Transports Parisiens) to equip the 27 stations of Paris Metro the twelve kilometre Line 4 with signalling and operations control systems.

Siemens will supply its Trainguard MT automatic train control system that uses communications-based technology to achieve fully automatic, driverless operation. All train movements will be supervised via the operation control centre, which will also be supplied by Siemens. Special doors at the platforms will ensure additional safety at all 27 metro stations.

With around 700,000 passengers a day, Line 4 of the Paris Metro is one of the most frequented sections of the whole Paris mass transit network and the most important north-south metro link in the city. On its way through France's capital it stops at three major long-distance railway stations and is also the only line with transfer terminals to all 16 other mass transit lines.

"Automatic operation will enable Line 4 to offer a service interval of 85 seconds. At the same time, the automatic control will allow to reduce energy consumption by up to 15 percent," says Jochen Eickholt, CEO of Siemens Mobility. The order is worth around US$76 million. Work on the line is scheduled for completion in 2022.

Related Content

  • August 14, 2013
    Siemens wins metro deal in India
    German technology company Siemens has secured a US$93.04 million contract from IL&FS Rail for the construction of an extension of seven kilometres to the automated Gurgaon Metro in India. Under the deal, Siemens will supply seven new metro trains as well as installing train control and signalling systems. The project involves extension of the Gurgaon Metro line with a new seven kilometre long southern line. The new line will add six stations in the south-east of Gurgaon. “The Gurgaon metro project is a fi
  • December 18, 2015
    Thales to upgrade Greater Cairo Metro
    More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
  • February 21, 2017
    French consortium to build Line 3 of Hanoi metro
    International technology company Thales, as part of a French consortium including Alstom and Colas Rail, is to provide a complete telecommunications system for Line 3 of the Hanoi metro, the first of five lines planned for the Vietnamese capital. Hanoi’s metro project plays a crucial role in relieving congestion and improving road safety for the city’s 7.5 million inhabitants. Under the urban transport master plan adopted by the city several years ago, five metro lines are due to be built by 2030. Th
  • July 9, 2013
    Siemens traffic solutions improve Amsterdam bottleneck
    Solutions supplied by Siemens are helping to improve traffic conditions at the Coentunnel, one of the most heavily used traffic arteries in the Netherlands, used by 100,000 vehicles every day. The tunnel, which links Amsterdam to the province of North Holland, has been a cause of traffic congestion and delays for many years. A much-needed second tunnel opened in spring 2013, together with a three kilometre long elevated section of freeway connecting the tunnel with the southern part of the city to relieve t