Skip to main content

Siemens to equip Line 4 of Paris Metro for driverless operation

Siemens received an order from the Paris public transport operator RATP (Régie Autonome des Transports Parisiens) to equip the 27 stations of Paris Metro the twelve kilometre Line 4 with signalling and operations control systems. Siemens will supply its Trainguard MT automatic train control system that uses communications-based technology to achieve fully automatic, driverless operation. All train movements will be supervised via the operation control centre, which will also be supplied by Siemens. Spec
January 12, 2016 Read time: 2 mins
189 Siemens received an order from the Paris public transport operator RATP (Régie Autonome des Transports Parisiens) to equip the 27 stations of Paris Metro the twelve kilometre Line 4 with signalling and operations control systems.

Siemens will supply its Trainguard MT automatic train control system that uses communications-based technology to achieve fully automatic, driverless operation. All train movements will be supervised via the operation control centre, which will also be supplied by Siemens. Special doors at the platforms will ensure additional safety at all 27 metro stations.

With around 700,000 passengers a day, Line 4 of the Paris Metro is one of the most frequented sections of the whole Paris mass transit network and the most important north-south metro link in the city. On its way through France's capital it stops at three major long-distance railway stations and is also the only line with transfer terminals to all 16 other mass transit lines.

"Automatic operation will enable Line 4 to offer a service interval of 85 seconds. At the same time, the automatic control will allow to reduce energy consumption by up to 15 percent," says Jochen Eickholt, CEO of Siemens Mobility. The order is worth around US$76 million. Work on the line is scheduled for completion in 2022.

Related Content

  • February 6, 2014
    Siemens focuses on mobility solutions at Intertraffic
    Siemens will have a major presence at Intertraffic Amsterdam 2014 to highlight its “mobility solutions of tomorrow” based on three key attributes - integrated, intelligent, and innovative. As a leading supplier of integrated mobility solutions, Siemens also plans to make a lasting technological impression at Intertraffic, with several key presentations. For traffic control made very easy, fast and flexible via the internet, the company will highlight Sitraffic SmartGuard. This is especially interesting to c
  • July 25, 2014
    Bogota's metro tender delayed
    The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p
  • July 24, 2013
    San Diego rail line gets positive train control
    Rail Technology supplier Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million. Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train,
  • December 20, 2012
    Integrated passenger transport system for Luxembourg
    Luxembourg’s integrated passenger transport system is to benefit from a new system for control, passenger information and electronic fare collection (e-ticketing). Init has been awarded a contract by the Luxembourg transport association to equip thirty-four private and three public transport companies with the system over the next three years. The contract also includes control centres and providing around 920 vehicles with hardware and software.