Skip to main content

Siemens to equip Line 4 of Paris Metro for driverless operation

Siemens received an order from the Paris public transport operator RATP (Régie Autonome des Transports Parisiens) to equip the 27 stations of Paris Metro the twelve kilometre Line 4 with signalling and operations control systems. Siemens will supply its Trainguard MT automatic train control system that uses communications-based technology to achieve fully automatic, driverless operation. All train movements will be supervised via the operation control centre, which will also be supplied by Siemens. Spec
January 12, 2016 Read time: 2 mins
189 Siemens received an order from the Paris public transport operator RATP (Régie Autonome des Transports Parisiens) to equip the 27 stations of Paris Metro the twelve kilometre Line 4 with signalling and operations control systems.

Siemens will supply its Trainguard MT automatic train control system that uses communications-based technology to achieve fully automatic, driverless operation. All train movements will be supervised via the operation control centre, which will also be supplied by Siemens. Special doors at the platforms will ensure additional safety at all 27 metro stations.

With around 700,000 passengers a day, Line 4 of the Paris Metro is one of the most frequented sections of the whole Paris mass transit network and the most important north-south metro link in the city. On its way through France's capital it stops at three major long-distance railway stations and is also the only line with transfer terminals to all 16 other mass transit lines.

"Automatic operation will enable Line 4 to offer a service interval of 85 seconds. At the same time, the automatic control will allow to reduce energy consumption by up to 15 percent," says Jochen Eickholt, CEO of Siemens Mobility. The order is worth around US$76 million. Work on the line is scheduled for completion in 2022.

Related Content

  • April 9, 2015
    Integrated public transport systems ‘make travel easier and more affordable’
    Streamlining schedules, stops, fares, and passenger information among subways, buses and commuter rail, will make it easier for passengers, cut down on operational costs and boost operational revenue, according to a new World Bank paper published today, Public Transport Service Optimisation and System Integration. The paper, which is part of the China Transport Notes Series produced by the World Bank in Beijing to share experiences about the transformation of the Chinese transport sector, claims lack of
  • February 14, 2018
    Egis selected as project consultant for Bangkok monorail contract
    Thai Mass Rapid Transit Authority has chosen Egis as a project consultant for Bangkok’s Pink Line monorail along with its local partner Team Consult. The estimated ฿53.5bn (£1.2bn) scheme will deploy 42 trains with a maximum speed of 80 km / h with the intention of carrying more than 28,000 passengers per hour in each direction and increasing everyday journeys to more than 400,000 people. This venture is part of the Mass Rapid Transit Master Plan which intends to develop the public transport network in the
  • June 20, 2012
    Multi-modal transport system key to liveable city development
    Malaysia’s Economic Transformation Programme aims to transform Kuala Lumpur into one of the world’s most liveable cities. Mohd Nur Kamal, CEO of SPAD, Malaysia’s Land Transport Commission, explains how a world class multi-modal transport system will be key to reaching that goal Superficially, Kuala Lumpur, or KL as it is commonly known, is the model of a vibrant, modern, cosmopolitan city to equal any in the world. The Petronas Twin Towers, an iconic global symbol of Malaysia, are surrounded by stunningly
  • August 1, 2014
    Santiago issues tender for number six metro line
    Chile's Metro de Santiago has called an international tender for the acquisition of lighting systems and their installation in the city's new number 6 line. According to tender documents, rights to participate can be purchased until 29 July. Technical and economic bids are due on 3 October. Technical proposals will be opened the same day, while bids will be unveiled on 24 October. The line is a US$1.06 billion project that will run 15.3 kilometres across the capital from centrally located Providencia