Skip to main content

Siemens to electrify metro line in Ecuador

Siemens has been commissioned by the Acciona-Odebrecht construction consortium to electrify the entire Metro Line 1 in the Ecuador capital, Quito. Line 1 is intended to improve daily commuting in the city, since it will provide direct routes from north and south of the city into the downtown area and historical city centre. The line is scheduled to begin passenger service in summer 2019. The city's first metro line will run over 20 kilometres through the city and operate at an elevation of more than 2,80
October 21, 2016 Read time: 2 mins
189 Siemens has been commissioned by the 4744 Acciona-4740 Odebrecht construction consortium to electrify the entire Metro Line 1 in the Ecuador capital, Quito. Line 1 is intended to improve daily commuting in the city, since it will provide direct routes from north and south of the city into the downtown area and historical city centre. The line is scheduled to begin passenger service in summer 2019.

The city's first metro line will run over 20 kilometres through the city and operate at an elevation of more than 2,800 metres above sea level. Siemens will be responsible for the complete electrification of the new double-track Metro Line 1 that will connect the northern and southern parts of the city with 15 stations. The scope of the project includes about 46 kilometres of rigid catenary, six kilometres of flexible catenary, eleven traction power supply stations, 29 auxiliary power supply stations, and the SCADA (Supervisory Control and Data Acquisition) system for monitoring and controlling the traction power supply.

The new rail system is an important step in the modernisation of the city and is expected to transport more than 350,000 passengers a day when completed. The city's current heavy volume of traffic regularly leads to traffic jams and smog. By providing a more environmentally friendly mass transit system, the city expects to reduce CO2 emissions by up to 30,000 tons a year.

For more information on companies in this article

Related Content

  • Caltrans to focus on traffic management in 2014
    February 21, 2014
    Although San Diego County may see a downturn new freeway infrastructure projects during 2014, many projects, from rail to highways and cycle paths, are still in the pipeline for 2014, according to the region's transportation planning agencies. Laurie Berman, district director for the regional office of the California Department of Transportation, said last week that Caltrans' focus is transitioning from general purpose lane expansions to more traffic management. The new direction is meant to provide trav
  • Thales delivers automated train control systems to Santiago de Chile
    November 8, 2017
    Thales has supplied its driverless train control system: Seltrac CBTC solution for Santiago de Chile’s new metro lines 3 and 6. The technology aims to ensure safety and efficiency across the entire route, with a 90 second interval between trains as well as lower long-term operating costs and savings in traction power. Launched on 2 November 2017, the new metro line 6 aims to carry over 20,000 passengers per hour in each direction. Together, both lines will have a combined length of 37km, with 28 station
  • Danish tunnel gets Afry ITS system
    September 28, 2022
    Project is designed to reduce heavy goods vehicle traffic in centre of Copenhagen
  • Hydrogen filling station operating in California
    April 11, 2012
    Linde North America, a specialist in the design, construction and operation of hydrogen vehicle fuelling systems, has commissioned an installation at AC Transit, the bus operator for 13 cities in the East Bay Area, including Emeryville, Oakland and Berkeley, and also operates trans-bay service to San Francisco. The Emeryville hydrogen fuelling station, which is now fuelling 12 fuel cell buses and up to 20 passenger cars a day, is one of two Linde is supplying to AC Transit. The second, located at the Oaklan