Skip to main content

Siemens electrifies Scottish businesses

Siemens has installed electric vehicle (EV) charge points for businesses across Scotland, including Robert Gordon University (RGU) in Aberdeen, SGM Distribution and Edinburgh College. The company’s new and comprehensive range of Transport Scotland-compliant charging points includes AC chargers that provide both single and three phase charging via single or dual outlets, and can be floor standing, pole or wall mounted. Also included in the range is a triple outlet, multi-standard, rapid charging station
August 10, 2015 Read time: 2 mins
189 Siemens has installed electric vehicle (EV) charge points for businesses across Scotland, including Robert Gordon University (RGU) in Aberdeen, SGM Distribution and Edinburgh College.
 
The company’s new and comprehensive range of 505 Transport Scotland-compliant charging points includes AC chargers that provide both single and three phase charging via single or dual outlets, and can be floor standing, pole or wall mounted. Also included in the range is a triple outlet, multi-standard, rapid charging station - supporting all CHAdeMO, CCS COMBO 2 and AC output standards in a single unit. All Siemens chargers are fully tested and certified to work with the Transport Scotland approved Charge Your Car (CYC) nationwide Pay As You Go and back-office system.
 
Through the ChargePlace Scotland project, 100 per cent grant funding is available to Scottish based businesses for the installation of EV charge points for workplaces. The aim of this funding is to complement the national network of charge points being installed across Scotland to promote electric vehicle use.
 
RGU in Aberdeen recently installed a dual outlet charge point to double the number of charge points on its Garthdee Campus.  The University already has one electric van, currently used as the mail van, and will shortly be adding a second electric van to their fleet.  The charge points can also be used by staff, students and the general public.
 
Meanwhile, Scottish courier and express distribution firm SGM Distribution has become the first company north of the border to deploy two all-electric Mercedes Vito Ecell vehicles, the latest additions to a 46-vehicle fleet built up by the company since it was founded in 2006 on the outskirts of Letham, near Forfar.
 
Edinburgh College has also been a pioneer in electric mobility, offering staff a fully-electric pool car fleet for the last three years, while adding to the infrastructure of the city for the benefit of all EV users. More recently, to further bolster nationwide infrastructure, Transport Scotland selected the College to become a partner in the new ‘Switched on @ Work’ scheme.

For more information on companies in this article

Related Content

  • The great pay divide
    April 2, 2014
    Public acceptance is crucial for the acceptance of managed and express lanes as Jon Masters discovers. Lists of proposed highway expansion projects introducing variably priced toll lanes continue to lengthen. Managed lanes, or express lanes to some, are gaining support as a politically favourable way of adding capacity and reducing acute congestion on principal highways. In Florida, for example, the managed lanes on the 95 Express are claimed to have significantly increased average peak-time speeds on tolle
  • ACE report: private sector and user-pay for English roads
    May 16, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report - and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas. Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently-published report Funding Roads for the Future. The 25-page document by the London-based Association for Consultancy and Engineering (ACE) calls for a radical rethink about how to
  • Siemens delivers pedestrian countdown at traffic signals
    November 30, 2015
    First shown at Traffex 2015 in April, production of Siemens’ new Pedestrian Countdown at Traffic Signals (PCaTS) is now fully under way. PCaTS informs pedestrians how long they have to cross the road after the far-side green man signal has gone out. By providing a visible countdown of the time remaining before the appearance of the red man, PCaTS is intended to give pedestrians a better understanding of the time available to complete crossing, reducing anxiety once the green man is no longer displayed. B
  • SRL shows green for highway workzone stop and go
    June 5, 2023
    Company launches Rosgo as well as enhancing Urban64 traffic control system